My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9631 18TH AVE W 2025-06-25
>
Address Records
>
18TH AVE W
>
9631
>
9631 18TH AVE W 2025-06-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 8:29:54 AM
Creation date
4/18/2025 10:17:16 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9631
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 4/2/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1904-004 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $261.57 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> ANA IGLESIAS MICHAEL GERRUDETTE <br /> 9631 18TH AVE W 9631 18TH AVE W <br /> EVERETT,WA,98204 EVERETT,WA,98204 <br /> PHONE: PHONE:4252132228 <br /> TAX PARCEL ID M 00947100000100 SITE ADDRESS:9631 18TH AVE W <br /> DESCRIPTION: <br /> REPLACE EXISTING FENCE,CONCRETE 20X22 ON THE DRIVWAY AND 270 SF WALKWAY TO HOUSE, REPLACE EXISTING DECK -8'X16'; <br /> NOT ATTACHED TO HOUSE(FREESTANDING)AND UNDER 30" IN HEIGHT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 06/28/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan.Remove upon completion of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt,mud, rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: <br /> Paving(710SF)................................................$45.00 <br /> PW Plan Review.............................................$20.00 <br /> PW Site Inspection.........................................$20.00 <br /> Stormwater System Development Fee...........$176.57 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> Z ZOJ causes of action that may arise because of installation and maintenance of <br /> the improvement or other right-of-way use here to applied for and further <br /> Approved for Construction(PublicWorks) Date <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> 'r L-e 60 CI <br />
The URL can be used to link to this page
Your browser does not support the video tag.