PUBLIC WORKS UTILITY Date Applied: 11/22/2019 <br /> PERMIT PW Utility Permit#: PW1911-041 <br /> City of Everett Permit Services Parent Permit#: <br /> E V E R E T T <br /> 3200 Cedar Street, 2nd Floor Permit Type: PUBLIC WORKS UTILITY <br /> WASHINGTON Everett, WA 98201 Permit Subtype: OTHER ROW WORK <br /> 425-257-8810 Permit Fee: $62.00 <br /> UTILITY COMPANY NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MCI METRO ACCESS TRANSMISSION SERVICES MACKENZIE GREEN <br /> 3245 158TH AVE SE 6244 185TH AVE NE,STE 250 <br /> BELLEVUE,WA, 98008 REDMOND,WA,98052 <br /> PHONE:4253018658 PHONE:2063109513 <br /> TAX PARCEL ID#:00411300600100 SITE ADDRESS:3909 HOYT AVE <br /> DESCRIPTION: INSTALL 2"CONDUIT AND 12CT FIBER ON 39TH ST AND HOYT AVE <br /> CONSTRUCTION TO CONSIST OF OPEN TRENCH AND DIRECTIONAL BORE STARTING AT EXISTING VERIZON VAULT ON THE NORTH SIDE OF <br /> 39TH ST PER PLANS.CONSTRUCTION TO RUN EAST ALONG 39TH ST AND THE CONTINUE SOUTH AT THE INTERSECTION OF HOYT AVE. <br /> END CONSTRUCTION AT SITE LOCATION WAEVT-002 ON THE EAST SIDE OF HOYTE AVE IN SOFT SURFACE TO INSTALL(1)2436 <br /> HANDHOLE. PLACE(1) 2" CONDUIT AND PULL(1) 12CT FIBER CABLE THROUGHOUT. CONTRACTOR TO VERIFY EXISTING UTILITY DEPTHS <br /> AND LOCATIONS PRIOR TO CONSTRUCTION. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 2. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 3. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved by City of Everett dated 04/28/2020. <br /> 4. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW Inspector. <br /> 5.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614,or as directed by the City PW Inspector. <br /> Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 6. Full lane width grind and overlay is required for trenches greater than 100'in length,multiple cuts within a 100'length section,and/or as directed <br /> by the City PW Inspector. <br /> 7. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 8. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.Inspections are required for job start notification,potholing all City utilities,evaluation of traffic control set-up,to view the work prior to <br /> backfill,and after final restoration to final the permit. <br /> 9.Potholing required for all crossings over/under City of Everett water mains. <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> 11.Noise from temporary construction sites is not allowed 10:OOPM—7:OOAM weekdays,6:OOPM—8:OOAM weekends unless a variance has been <br /> issued.Construction projects wishing a variance from the noise ordinance must submit an application at least 30 days prior to commencing work. <br /> Please visit the following website for more information https://everettwa.gov/1545/Noise-Administration <br /> Public Works Permit Fee Breakdown: <br /> Cut/Bore Alley/Pavement(Non-Parallel)(31 LF)......$93.00 <br /> Cut/Bore Alley/Pavement(Parallel)(367 LF)..........$367.00 <br /> PW Plan Review........................................................$20.00 <br /> PW Site Inspection....................................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> 74ad 7kA*t1r 04/29/2020 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />