Laserfiche WebLink
GENERAL NOTES <br /> GENERAL NOTES: <br /> The locations of utilities shown on these drawing are only approximate. MGC TECHNICAL CONSULTING,INC. hereby disclaims any responsibility <br /> to third parties for the accuracy of this information. Persons working in the area covered by this drawing must contact the statewide <br /> Call-Before-You-Dig System to ascertain the location of underground utilities prior to performing any excavation. <br /> 1. ALL MATERIALS,WORKMANSHIP,AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK <br /> STANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE EVERETT REGULATIONS AND APPLICABLE STATE <br /> AND FEDERAL REGULATIONS.WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS,OR ANY APPLICABLE <br /> STANDARDS,THE HIGHER QUALITY STANDARD SHALL APPLY.ALL WORK WITHIN PUBLIC R.O.W.OR EASEMENTS MAY REQUIRE <br /> INSPECTED AND APPROVED BY THE EVERETT INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO <br /> BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER. <br /> 2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES,AS SHOWN ON <br /> THESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND,WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE <br /> FIELD.THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE.THE CONTRACTOR MUST CALL THE LOCAL <br /> UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING <br /> UTILITIES.THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS,ESPECIALLY AT THE CONNECTION POINTS <br /> AND AT POTENTIAL UTILITY CONFLICTS.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING <br /> UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. <br /> 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE <br /> CONTRACTOR SHALL NOTIFY THE EVERETT INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH <br /> DISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED. <br /> 4. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE EVERETT AND ALL UTILITY COMPANIES WITH REGARD <br /> TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION,TO ASSURE THAT THE WORK IS <br /> ACCOMPLISHED IN A TIMELY FASHION,AND WITH A MINIMUM DISRUPTION OF SERVICE.THE CONTRACTOR SHALL BE RESPONSIBLE <br /> FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE. <br /> 5. THE CONTRACTOR SHALL HAVE ONE(1)SIGNED COPY OF THE APPROVED PLANS,ONE(1)COPY OF THE APPROPRIATE STANDARDS <br /> AND SPECIFICATIONS,AND ONE(1)COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL <br /> TIMES. <br /> 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING,BUT NOT LIMITED TO:EXCAVATION, <br /> TRENCHING,SHORING,TRAFFIC CONTROL,AND SECURITY. <br /> 7. IF,DURING THE CONSTRUCTION PROCESS,CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR,HIS SUBCONTRACTORS,OR <br /> OTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS,THE <br /> CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY. <br /> 8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD,UNLESS <br /> SPECIFICALLY STATED OTHERWISE. <br /> 9. FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE EVERETT,THE CONTRACTOR SHALL SUBMIT A <br /> TRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D.FOR APPROVAL.PRIOR TO ANY CONSTRUCTION ACTIVITIES <br /> WITHIN OR AFFECTING THE RIGHT-OF-WAY,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC <br /> CONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS.PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE <br /> HELD WITH EVERETT. <br /> 10.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE <br /> INTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED,CONSTRUCTED,REMOVED <br /> OR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE. <br /> 11. PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL <br /> CONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE. <br /> 12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT <br /> THE CONSTRUCTION SITE AND AVAILABLE TO THE EVERETT INSPECTOR AT ALL TIMES. <br /> Know what's below. <br /> 13. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING.FOR ADDITIONAL INFORMATION Call before you dig. <br /> CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS. <br /> 3 AS-BUILT <br /> 14.ALL EROSION AND SEDIMENT CONTROL(E.S.C.)MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO 2 REVISION# i <br /> GROUND DISTURBING ACTIVITY.ALL E.S.C.MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH NO. DAA TE TE 1 4 MF BF ORIGINAL <br /> ENGINEER DRAFTER COMMENT <br /> TIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING. <br /> 15.ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE EVERETT ENGINEERING verizonw/ MGC <br /> DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS. <br /> VERIZON WIRELESS ENGINEER:DAVID LACOMBE <br /> 16.ALL CONSTRUCTION OPERATIONS,INCLUDING THE WARMING UP,REPAIR,ARRIVAL,DEPARTURE OR RUNNING OF TRUCKS,EARTH ENGINEERING FIRM:MGC TECHNICAL CONSULTING INC. <br /> MOVING EQUIPMENT,CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE PROJECT NAME:TULLY'S EVERETT-WAEVT-002 <br /> TIME PERIOD APPROVED BY THE EVERETT. LOCATION:3909 HOYT AVE <br /> EVERETT,WA 98201 <br /> PERMIT NUMBER: <br /> DRAWING NAME:VERIZON-VERIZON WIRELESS-TULLY'S EVERETT-WAEVT-002-RELO-PLANS., <br /> CONFIDENTIAL/PROPRIETARY SHEET: 3 OF 6 <br />