My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY L & L HAWAIIAN BBQ 2025-10-22
>
Address Records
>
EVERGREEN WAY
>
7601
>
L & L HAWAIIAN BBQ
>
7601 EVERGREEN WAY L & L HAWAIIAN BBQ 2025-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 11:48:06 AM
Creation date
4/18/2025 2:46:41 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
L & L HAWAIIAN BBQ
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2304-015 <br />Applied: 4/6/2023 <br />Issued: 6/1/2023 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:5/31/2023 <br />Finaled: 2/28/2025 <br />Description: TI NEW TENANT FIT -OUT, DEMO PARTITIONS <br />Site Address: 7601 EVERGREEN WAY UNIT B3 <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: MARK KIM <br />Owner: COLUMBIA CASCADE PLAZA LLC <br />Contractor: GOLD CONSTRUCTION <br />Details: <br />PRIOR BUSINESS WAS CHECK CASHING PLACE TURNING INTO A BAR B QUE PLACE. <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />8/24/2023 <br />8/24/2023 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />NOT READY <br />Notes: <br />206-450-5722 <br />Get rough -in approval for all sub permits( electrical, mechanical, plumbing & fire) prior to framing inspection. Reschedule framing inspection once sub <br />permit, Ruffin approval is received. <br />9/7/2023 <br />9/7/2023 <br />BLDG 08-FRAMING <br />I Matt Schreifels <br />NOT READY <br />Notes: <br />206-450-5722 <br />Get rough -in approval for all sub permits( electrical, mechanical, plumbing & fire) prior to framing inspection. Reschedule framing inspection once sub <br />permit, Ruffin approval is received. <br />9/14/2023 <br />9/18/2023 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />PARTIAL <br />APPROVAL <br />Notes: <br />Inspected on 9/14/23 & resulted on 9/18/23 <br />steel stud wall framing <br />9/15/2023 <br />9/18/2023 <br />BLDG 10-DRYWALL <br />FMatt Schreifels <br />PARTIAL <br />NAILING <br />APPROVAL <br />Notes: <br />drywall nailing on walls. <br />Inspected on 9/15/23 and resulted on 9/18/23. <br />PERMIT EXTENSION <br />3/15/2024 <br />3/15/2024 <br />(REASON <br />LISA ROMA <br />EXTENSION <br />eTRAKiT Inspection Request <br />REQUIRED) <br />APPROVED <br />Notes: <br />3/12/2024 11:57 AM Mark Kim <br />Contact Name: Mark Kim <br />Site Address: 7601 EVERGREEN WAY UNIT B3 <br />Phone:4253813434 <br />e-Mail: mkim331@hotmail.com <br />I <br />Printed: Wednesday, 12 March, 2025 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.