My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9502 18TH AVE W UNIT P 2025-08-20
>
Address Records
>
18TH AVE W
>
9502
>
UNIT P
>
9502 18TH AVE W UNIT P 2025-08-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:01:58 AM
Creation date
4/21/2025 11:05:45 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
9502
Tenant Name
UNIT P
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.1 <br /> ix <br /> CITY vF EVERETT 1 <br /> EVERETT OFFICE USE ONLY <br /> WASHINGTON Permit Services Transmittal tar t. E <br /> PERMIT/PROJECT#: B2310-031 NOV U 9 2023 <br /> SITE ADDRESS: 9502 18TH AVE W UNIT P EVERETT <br /> PROJECT NAME: HARRISON POINTE CITY OF EVERETT <br /> Permit Services <br /> FROM: RHONDA CLANCY COMPANY:PACIFIC RIDGE HOMES 0 Chronology—Permit Counter Transmittal <br /> 0 Plan Review Routing <br /> PHONE#: 425.939.1164 EMAIL: RLCLANCYDRHORTON.COM Location: ['File ❑Reviewer Office <br /> Date Logged: By: <br /> Route to:(Check all that apply) Name of Reviewer Type of Review <br /> m Planning Reviewer Name: ❑ Re-Review <br /> ❑ Public Works Reviewer Name: ❑ Revisions After Approval <br /> © Building Reviewer Name: ❑ Revisions After Issuance <br /> ❑ Fire Reviewer Name: ❑ Other <br /> © Other Reviewer Name:CINDY BERGSMA ❑ Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Architectural/Building Plans _ Geotechnical Report _ Correction Letter Responses <br /> Structural Plans _ Drainage Report _ Draft Easement <br /> Civil Plans _ SWPPP Report _ Recorded Easement <br /> Site Plan _ Wetland Report _ Height Survey <br /> Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> Elevations _ Structural Calculations Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant Other <br /> Special Inspection Report _ Plumbing Calculations _ Performance Guarantee <br /> As-Builts _ Other _ Warranty Bond <br /> Plat Maps Other Other <br /> Original City Redlines Returned _ Other Other <br /> 2 Other Response letter _ Other Other <br /> 2 Other Crawl Space Drain Plan _ Other Other <br /> Items submitted are: <br /> m Complete Plan Set Replacement ❑Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> 2 copies response letter Revised Description of Work: <br /> 2 copies drain plan <br /> Revised Valuation: j <br /> Signed: Date: 11/7/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.