Laserfiche WebLink
BTL <br />ENGINEERING <br />SPECIAL INSPECTION <br />Date: <br />February 20, 2024 <br />To: <br />Pacific Ridge Homes <br />Attn: <br />Sam Wiper <br />From: <br />Aiden Bernhardt <br />Project: <br />Harrison Point — Lot 16 <br />Thelon B- Garage Left <br />Pages: 1 <br />19011 Wood-Sno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 814-8448 <br />Fax: (425) 821-2120 <br />BTL Engineering has performed Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at 4" on center or less for the abovementioned project. The following Special Inspection Report includes a <br />summary of our site visit. <br />Construction Documents: <br />❑ Construction Set dated 05/12/2023 <br />Progress of construction: <br />❑ Date of inspection: 2/20/2024 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />1 st Floor Walls: <br />❑ Rear/Sides/Interior: P1--6—No Inspection Required <br />❑ Front P1-2 Shear Walls <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />o Panel Seams Construction: Construction conforms to plan set. <br />o Foundation Anchorage: Construction conforms to plan set. <br />o Garage Pier Construction: Construction conforms to plan set. <br />2nd Floor Walls: <br />❑ All Sides: P1-6 - No Inspection required <br />Give me a call if you have any questions or comments. <br />Sincerely, <br />Aiden Bernhardt <br />BTL Engineering <br />