My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 EVERETT AVE SEPA 018 - 008 Plans 2025-04-23
>
Address Records
>
EVERETT AVE
>
2201
>
SEPA 018 - 008
>
Plans
>
2201 EVERETT AVE SEPA 018 - 008 Plans 2025-04-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 7:45:07 AM
Creation date
4/21/2025 2:36:36 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERETT AVE
Street Number
2201
Tenant Name
SEPA 018 - 008
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X <br />EROSION CONTROL NOTES <br />A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THERE BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE CLEARING TAKES PLACE. <br />AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA MADE ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING <br />LIMITS, <br />B HAND O REQUIRED, OETEA SHALL,WAYBDE <br />LINEATED CLEARED. <br />THE TOP OF THE <br />AN ORANGE LT FENCE <br />SHALL BE REFLAGGED AFTER THE INSTALLATION. IF A <br />I <br />B. ALL PERIMETER AND SEDIMENT 'ONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS INSPECTOR PRIOR TO <br />INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPER AND PUBLIC WORKS INSPECTOR. NO TREES <br />SHALL BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br />D. WHERE POSSIBLE, NATURAL VE33ETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL. <br />E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED <br />AS REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL. <br />F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH A TIME THAT <br />CLEARING AND/OR CONSTRUCTION IS COMPLETED, P=RMANNT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS <br />PASSED. <br />G. TA PROPER UM,ROSION AN SEDIMENT CONTROL <br />ANDACIILII TES SHALL BE CONTROL FACILITIES. <br />MONTHLY, R FOLLOWING EACH RUNOFF —PRODUCING STORM, <br />TO <br />H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT PIPES, RESTRICTORS, R <br />DETENTION FACILITIES; BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMP'S ONLY. <br />1. THE PUBLIC RIGHT—OF—WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE ALLOWED. FAILURE TO COMPLY <br />WITH THIS CONDITION WALL RESJLT IN ALL WORK ON SITE BEING STOPPED. <br />J. THE WASHINGTON STATE CLEAN AfR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF WORK CONTROLLING AIR <br />POLLUTION, INCLUDING DUST. DUST CAN CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE THEY LEAVE THE SITE, <br />EAND INSTALLING AND VIDENCE OF TRACK —OUT CAN iTRIGGER FINNG ROCK ES FROMRTHE ON ED PARTTMMENT OFS. SECOLOGY ORUCTION THEPUGEICLE CT SOUND AIR POLLUOUT IS A MAJOR TION CONTROL AGENCY.URCE OF DUST AND ANY <br />K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY <br />CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS). <br />2x2 OR EQUAL <br />POST, 4' O.C. <br />USE STAPLES <br />OR WIRE RINGS <br />tat <br />i <br />BURY BOTTOM OF FABRIC <br />MATERIAL IN 8"x12" TRENCH <br />2"X 2" OR EQUAL <br />POST, 4' O.C. <br />USE STAPLES <br />OR WIRE RINGS <br />FILTER FABRIC ON <br />2"X 2" 14 GA. WIRE <br />FABRIC <br />3/4" WASHED ROCK--\ 6" <br />NEWLY GRADED OR <br />DISTURBED SITE <br />FLOW <br />12" <br />BURY BOTTOM OF FABRIC <br />MATERIAL IN 8"X 12" TRENCH <br />SILTATION CONTOL FENCE DETAIL <br />NOT TO SCALE <br />ADDITIONAL GRADING AND EROSION CONTROL NOTES <br />1. RECOMMEND TEMPORARY STREAM PIPEING IN CHANNEL DURING CONSTRUCTION. <br />2. INSTALL CHECK DAMS IN SWALES: SEE C.O.E. DETAIL 2108. <br />3. SEDIMENT TRAPS TO BE CONSTRUCTED PER C.O.E. STORMWATER MANUAL (BMP E3.35). <br />4. PHASING OF CONSTRUCTION TO BE SEQUENCED PER NOTES SHOWN ON SHEET 5, AND ABIDE <br />BY <br />C.Q.E. STRMWATER MANAGEMENT MANUAL. <br />5. ADDITIONAL SEDIMENTATION CONTROL MAY BE REQUIRED DURING THE CONSTRUCTION PROCESS. <br />TREATMENT AND OR THE USE OF BAFFLED BAKER TANKS MAY BE NEEDED. <br />6. NO EXPOSED SOILS TO REMAIN. COVER USING MULCHES OR VISQUEEN. THIS APPLIES TO SOIL <br />STOCK PILES AS WELL <br />Dpyright 2017 by Brian R. Lindsay, B $e9"VtCeS LLC Design, map, text and data may not be used, copied or reproduced in any way without express written permission of Brian R. Lindsay, BR.G SeT" ices LLC <br />31 <br />EVERETT AVE <br />� SITE LOCATION <br />VICINITY MAP- <br />NTS <br />CONSTRUCT{ON SEQUENCE <br />1. ATTEND PRE —CONSTRUCTION CONFERENCE. <br />2. INSTALL T.E.S.C. MEASURES. <br />3. CLEAR AND GRADE SITE. <br />4. INSTALL STORM DRAINAGE SYSTEM. <br />5. AS —BUILT. <br />6. REMOVE T.E.S.C. MEASURES. <br />V. <br />g <br />G ST�g <br />If�L <br />SHEET: I REV: <br />
The URL can be used to link to this page
Your browser does not support the video tag.