My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Drainage Report 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
>
Drainage Report
>
5900 36TH AVE W PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Drainage Report 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 9:29:00 AM
Creation date
4/22/2025 8:39:44 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
PRE APP 015 - 032 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
Address Document Type
Drainage Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUNDVIEW TECHNOLOGY CENTER <br />EVERETT, WA <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Conversations with the City of Mukilteo on 3/7/17 indicate that they are aware of the conditions at the <br />vault outfall and have provided notice of the de -stabilized condition to the owner. <br />Downstream of the existing stormwater vault, the ravine continues in a general northerly direction where <br />it intersects with another ravine with surface flow in the swale area, see photo 11. This is the confluence <br />location of Basin D (described below). The ravine continues north to a point where it meets up with a <br />ravine identified as the end of Basin A. This was the end of the field reconnaissance. This location is <br />approximately 1/4 mile downstream from the site. <br />Since this project will detain the release rates to the predeveloped release rates in excess of the release <br />rates required for the project, no additional measures are proposed and the release flows will be <br />dispersed on -site at the low point of the swale. <br />MAY 23, 2017 <br />STORMWATER DRAINAGE REPORT <br />PAGE 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.