Laserfiche WebLink
SOUNDVIEW TECHNOLOGY CENTER <br />EVERETT, WA <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />r <br />i <br />MINIMUM REQUIREMENTS <br />Start Here <br />Does the project have <br />5.000 square feet or <br />more of new. replaced, <br />or new plus replaced <br />Yes <br />pollutant generating <br />impervious surface? <br />No <br />Does the project add <br />5.000 square feet <br />or more of new <br />impervious surfaces? <br />Yes <br />Vr - <br />=(s <br />See Minimum Requirement #6 <br />Next Question <br />Does the project <br />convert 314 acres or <br />more of native <br />vegetation to lawn or <br />landscaped areas. or <br />No convert 2.5 acres or <br />more of native <br />vegetation to pasture? <br />Yes <br />See Minimum <br />Requirements #1 <br />through #5 <br />Yes <br />Does the project have <br />2,000 square feet or <br />more of new. <br />replaced, or new plus <br />No replaced impervious <br />surfaces? <br />No <br />Does the project <br />have land - <br />disturbing <br />activities of 7.000 <br />Yes square feet or <br />more? <br />No <br />See Minimum <br />Requirement #2 <br />Minimum Requirement #1: Stormwater Site Plan Preparation <br />All projects meeting the thresholds in Section 2.4 shall prepare a Stormwater Site Plan for City of Everett <br />review. <br />MAY 23, 2017 <br />STORMWATER DRAINAGE REPORT <br />PAGE 3 <br />