My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W C BRIDGE POINT 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
BRIDGE POINT
>
5900 36TH AVE W C BRIDGE POINT 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 10:10:52 AM
Creation date
4/22/2025 10:03:25 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Unit
C
Tenant Name
BRIDGE POINT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Title Bridge Point Everett 500-Building C-2018 WSEC Date Apr 14,2022 <br /> SIIGC x A Calculation NEW BUILDING-SEMI-HEATED COMPLIES <br /> Fenestration and Opaque Door Assemblies PROPOSED TARGET <br /> Glazed Doors-South/East West Facing Assembly ID pF Glazed Door Rough Opening SHGC x A Glazed Door , Rough Opening SHGC x A <br /> SHGC (SF) , SHGC z (SF) <br /> Swinging entrance door A2.1,A2.2&A3.1 PF<0.2 0.380 144.0 54.7 0.38 144.0 54.7 <br /> Horizontal Assembly ID PF Skylight Rough Opening SHGC x A Skylight----i- Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> t <br /> Skylights Acrylic Triple Dome Skylight I I 0.350 1,408.0 492.8 0.35 1,408.0 492 8 <br /> Vertical Fenestration-North Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening ����SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> 90.0 Fixed-Class AW or site built See A2.1,A2.2&A3.1 PF<0.2 0.380 90.0 34.2 0.51 (1) � -, <br /> a.:l <br /> Vertical Fenestration-South/East/West Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening SHGC x A <br /> SHGC (SF) SHGC 1._..._ (SF) <br /> Fixed-Class AW or site built A2.1,A2.2&A3.1 PF<0.2 0.380 { 3,409.0 1,295.4 0.38 1 (1)3,409.0 1,295.4 <br /> Proposed Area 1 Proposed SHGC x A (� Target Area Target SHGC x A <br /> Project Totals i5,051 1,877 5,051 �t <br /> � ptl 1,889 <br /> 21Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.