Laserfiche WebLink
Project Title Bridge Point Everett 500-Building C-2018 WSEC Date Apr 14,2022 <br /> SIIGC x A Calculation NEW BUILDING-SEMI-HEATED COMPLIES <br /> Fenestration and Opaque Door Assemblies PROPOSED TARGET <br /> Glazed Doors-South/East West Facing Assembly ID pF Glazed Door Rough Opening SHGC x A Glazed Door , Rough Opening SHGC x A <br /> SHGC (SF) , SHGC z (SF) <br /> Swinging entrance door A2.1,A2.2&A3.1 PF<0.2 0.380 144.0 54.7 0.38 144.0 54.7 <br /> Horizontal Assembly ID PF Skylight Rough Opening SHGC x A Skylight----i- Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> t <br /> Skylights Acrylic Triple Dome Skylight I I 0.350 1,408.0 492.8 0.35 1,408.0 492 8 <br /> Vertical Fenestration-North Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening ����SHGC x A <br /> SHGC (SF) SHGC (SF) <br /> 90.0 Fixed-Class AW or site built See A2.1,A2.2&A3.1 PF<0.2 0.380 90.0 34.2 0.51 (1) � -, <br /> a.:l <br /> Vertical Fenestration-South/East/West Facing Assembly ID PF Fenestration Rough Opening SHGC x A Fenestration Rough Opening SHGC x A <br /> SHGC (SF) SHGC 1._..._ (SF) <br /> Fixed-Class AW or site built A2.1,A2.2&A3.1 PF<0.2 0.380 { 3,409.0 1,295.4 0.38 1 (1)3,409.0 1,295.4 <br /> Proposed Area 1 Proposed SHGC x A (� Target Area Target SHGC x A <br /> Project Totals i5,051 1,877 5,051 �t <br /> � ptl 1,889 <br /> 21Z <br />