Laserfiche WebLink
STEP 3. DETERMINE FLOW CONTROL REQUIREMENT <br />Does this project create greater than 200 square feet of net new impervious area (item F from <br />table above)? <br />x Yes No <br />If yes, then the project is not exempt and flow control is required. Complete entire <br />checklist. <br />If no, then the project is exempt from the flow control requirement. Skip the rest of <br />Step 3 and complete STEP 4 of this report. <br />Determination of `fee in -lieu of flow control' eligibility: <br />Is the project in the eligible sub -basin of the combined sewer area as depicted in Figure 6-10.1 <br />of the Figure 6-10.1 of the City of Everett Design and Construction Standards and <br />Specifications (pg 6-15). <br />Yes x No <br />If no, then the fee option is not available for your project. Skip the fee calculation <br />below and complete the rest of the checklist. <br />If yes, will this project choose to take the fee option instead of designing and installing a <br />flow control facility? <br />Yes No <br />If yes, then calculate fee using the table below and complete Steps 4 of this checklist <br />(Step 5 not required). <br />If no, skip the fee calculation below and complete the rest of the checklist. <br />Table for calculation of fee in -lieu <br />-of flow control <br />I. Enter total net new impervious (Item <br />F from table above <br />2. Subtract 200 sf <br />3. Fee per sf <br />$3.72/SF <br />Calculate Total Fee by multiplying item #2 by <br />item #3 <br />City, of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 8 <br />the Combined Sewer Area -September 2022 <br />