My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1626 BAKER AVE 2025-06-24
>
Address Records
>
BAKER AVE
>
1626
>
1626 BAKER AVE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 8:00:36 AM
Creation date
4/22/2025 11:01:03 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
1626
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 3. Detention Design Worksheet <br />Table 3: Small Project Detention Sizing <br />Sizing <br />Selected <br />Total Contributing Area to <br />Detention System <br />At least but less than* <br />Acres <br />(max) <br />Orifice Size <br />(in) <br />Riser Height, overflow <br />elevation above invert <br />of outlet pipe, (ft) <br />Riser <br />Diameter <br />(in) <br />De <br />Pipe <br />200 <br />400 <br />0.0092 <br />0.375 <br />1.5 <br />6 <br />400 <br />600 <br />0.0138 <br />0.375 <br />1.5 <br />8 <br />600 <br />800 <br />0.0184 <br />0.375 <br />1.5 <br />8 <br />800 <br />1000 <br />0.0230 <br />1 0.5 <br />1.5 <br />8 <br />1000 <br />1200 <br />0.0275 <br />0.5 <br />1.5 <br />8 <br />1200 <br />1400 <br />0.0321 <br />0.5 <br />1.5 <br />8 <br />1400 <br />1600 <br />0.0367 <br />0.5 <br />1.5 <br />8 <br />1600 1 <br />1800 <br />0.0413 <br />0.5 <br />2.0 <br />8 <br />1800 1 <br />2000 <br />0.0459 <br />0.5 <br />2.0 <br />8 <br />*For projects directing more than this total area draining to the detention facility, size using a continuou! <br />MGS Flood etc.). Do not use this table to size facility. <br />Outlet pipe shall be set 3" above bottom of detention pipe to allow for sediment storage. <br />Net new impervious area requiring mitigation (ft2): <br />Contributing impervious area to BMP: <br />Total contributing area including landscaped area (ftz): <br />All underground stormwater facilities shall be setback from any structure or property line a distant <br />ground disturbed in setting the structure. <br />Applicable access requirements of DCSS 4-4.2 (3) have been met. <br />
The URL can be used to link to this page
Your browser does not support the video tag.