Laserfiche WebLink
DONE! <br />You have now completed the Small Project Stormwater Report for the Combined <br />System. <br />Please review any sections you may have skipped to ensure all areas have been completed. <br />Ensure the following attachments have been added: <br />❑ Project Specific Stormwater Site Plan [This packet and drawings] <br />❑ Topographic Survey [if applicable] <br />❑ Declaration of Covenant <br />❑ Construction TESC Drawings <br />❑ Underground Injection Well (UIC) Registration* [if applicable] <br />You may need to register with the Washington State Department of Ecology at least 60 <br />days prior to commencing UIC Construction. For more information, visit: <br />e verettwa. gov/1985/Stormwater-Technical-Resources <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in 19 <br />the Combined Sewer Area-September2022 <br />