My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1626 BAKER AVE 2025-06-24
>
Address Records
>
BAKER AVE
>
1626
>
1626 BAKER AVE 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 8:00:36 AM
Creation date
4/22/2025 11:01:03 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
1626
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1. DETERMINE APPLICABILITY <br />Use the criteria below to determine if this template may be used for your project. If any <br />criteria below are marked "False," this template may not be used and a report <br />meeting City standards is required and shall be prepared by a professional <br />Engineer licensed in the State of Washington. Flow control facilities shall be <br />designed by an engineer for projects with 2,000 sf or more net new impervious area (see <br />Ste 5. <br />x❑ ❑ This project drains to the combined sewer. <br />x❑ ❑ This project will create at least 200 sf of net new impervious area. (See Item <br />"F " in Step 2) <br />x❑ ❑ I This project will create less than 5,000 ft2 of added plus replaced impervious <br />surface area (Item C + Item D in Step 2). <br />❑ I ❑ I This project converts less than 1 /4 acre of native vegetation, pasture, <br />scrub/shrub or unmaintained non-native vegetation to lawn or landscape <br />areas. <br />This project will not adversely impact a water of the state. <br />❑ I ❑ I This project will not change a natural drainage course and will not generate any <br />new concentrated flows leaving the site. <br />z❑ ❑ This project will not be constructed within a critical area or a critical area buffer <br />and will not adversely impact a critical area. See the City of Everett Municipal <br />Code, Title 19.37. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined SewerArea-September 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.