Laserfiche WebLink
SECTION 08, TOWNSHIP 29, RANGE 05 <br />THIS ARE4 <br />/ \ F <br />FW <br />FH <br />4zv <br />EXIST. VEGETATED BUFFER <br />ZONE TO BE MAINTAINED <br />SEE ELEMENT 1 <br />^'p <br />SOQ�� s' V hip <br />i <br />�,pp z <br />ROVIDE OUTLET i <br />PROTECTION A5 REQ ' D . <br />�?\�\ w PER ELEMENT 8PIV <br />X STING GAT SIN <br />1 <br />E I <br />"� <br />r ��=•� VIDE IN L PRO <br />t <br />26-2 PR <br />OTECT PER DETAIL <br />I THIS D <br />\\ <br />f^ ^ _z . _ <br />'"mil- "''�'--"T � I��"�� � � Ti •.'`.�`�' 1 \ \ <br />4 <br />FlRE <br />\ h. <br />�n <br />ROOM <br />j R�11/ / <br />Y' f <br />\ <br />I <br />\ <br />/ <br />r <br />— O <br />Y _ <br />E •�-•:�' i�f L <br />N 6 RAVEL <br />E XI5 TI 6 <br />a <br />, <br />r - <br />:..j . <br />I TE <br />TO E XPO RTED R <br />r <br />I �. <br />l <br />, <br />.Y: <br />;s <br />X. 18 <br />M• <br />............ <br />\ <br />( <br />APPRO <br />/ <br />y, I <br />\ r ! :t <br />\ <br />/ <br />fN <br />/ <br />W <br />q 'x <br />PN :• i <br />1. <br />/ <br />! <br />ww <br />^ i <br />r/RL <br />w - w <br />Lr <br />ROOM <br />EXISTING 20'x20' �^ r. T_.::,.;....,_ ;;'s : .�::' J _ I <br />•r' � e ' i. <br />s �x <br />r <br />a r �� J .x" <br />:4 <br />r <br />SLIDING 1 ATE <br />S>_L�UTU <br />/ <br />IV � •. 'Yti. <br />v� O <br />r <br />ENTRW <br />O <br />� T <br />N TO H BAS <br />IN, <br />X 5T I Z� <br />o ♦ <br />- <br />EI :S <br />V D T. <br />s <br />R I 0 P 0 <br />l�tl <br />... ...:-::: <br />PROTECT I PER DETAJ� <br />�. !. TH 15 DH(5a. s <br />► Q, Tw <br />T <br />EXI 5TIN6 CAT <br />CH <br />H BA <br />SIN, N , o <br />_ <br />.t <br />w <br />w <br />PROVIDE WATTLE BARRIER <br />`wl10 it <br />AROUND--GATGH BASIN 4♦ �� <br />INSTALL INLET PROTECT I ONiYj <br />PER DETAIL TH I 5 DWG . <br />_ <br />i J � <br />r /I/ <br />A5 / <br />� <br />1 <br />O <br />ccAz <br />cccAV 16 •• ,r� <br />EXI 5T I N6 ASPHALT w,! (' <br />PAVEMENT ( FUTURE <br />PARK IN6 AREA) V <br />0 <br />Q a �'�r,1'(�',�:t�,y,.�%•� s,� a �Y"�� s:- � r i�x :L�.�•-�'" �� t��c=��5 <br />a <br />WA.. NA' G, REFE:R TU E4SEMEiv; <br />RR X-1NG AND BOUNDARY LINE <br />(LOCATION u. AGREEMENT <br />AFN 9606100569 <br />I TE PLAN <br />1 " = 50' —0" <br />NORTH <br />MAX <br />DRAINAGE <br />GRATE FRAI <br />SEDIMENT <br />AND DEBRI <br />)W BYPASS <br />INLET GRATE <br />WATER <br />DRAII <br />BELO <br />DEVI, <br />SECTION VIEW ISOMETRIC VIEW <br />STORM DRAIN INLET FOTECTION PETAIL <br />NOT TO 5GALE <br />FUTURE WATER <br />TANK PER CIVIL <br />>s <br />J�. <br />EXIST. VEGETATED BUFFER i <br />ZONE TO BE MAINTAINED f <br />t <br />2.4' WIDE CGNC. TANK <br />FOUNDATION, J EACH <br />NOTES <br />1, CATCH BASIN INSERTS SHALL BE REMOVED AT THE <br />END OF THE PROJECT. <br />CATCH BASIN INSERTS ARE ONLY TO BE INSTALLED IN <br />DRAINAGE DEVICES PER THE MANUFACTURES'S <br />RECOMMENDATIONS. CATCH BASIN INLET INSERTS <br />SHALL BE INSTALLED IN CURB INLETS. <br />3- CATCH BASIN INSERTS SHALL BE INSTALLED PRIOR TO <br />CLEARING AND GRADING ACTIVITY, OR UPON <br />PLACEMENT OF A NEW CATCH BASIN. <br />4. SEDIMENT SHALL BE REMOVED FROM THE UNIT <br />WHEN IT BECOMES ONE THIRD FULL OR IN <br />ACCORDANCE WITH THE MANUFACTURES' <br />INSTRUCTIONS. <br />5. SEDIMENT REMOVAL SHALL BE ACCOMPLISHED BY <br />REMOVING THE INLET INSERTS. EMPTYING, AND <br />RE -INSTALLING IT INTO THE CATCH BASIN. DO NOT <br />WASH SEDIMENT INTO STORM DRAINS WHILE <br />CLEANING. <br />6. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE <br />STORM WATER STRUCTURE IT WILL SERVICE. <br />7. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF <br />SYSTEM (OVERFLOW BYPASS). <br />S. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF <br />THE BIGD WITHOUT SPILLING THE COLLECTED <br />MATERIAL. <br />9. PERFORM MAINTENANCE IN ACCORDANCE WITH <br />STANDARD SPECIFICATION 8-01.3(15), <br />SWPPP ELEMENTS: <br />ELEMENT 1: PRESERVE VE6ETATION/MARK GLEARIN6 LIMITS: <br />BUFFER ZONES (BMP 0102): PRIOR TO BEGINNING LAND DI5TURBIN6 <br />ACTIVITIES, IDENTIFY 4 CLEARLY MARK WITH 5I6N5, CONSTRUCTION <br />FENGIN6, OR FLA66IN6 ALL BUFFER ZONES, VE6ETATION, AND TOPSOIL <br />THAT SHOULD NOT BE DISTURBED. INSPECT THE AREA FREQUENTLY TO <br />MAKE SURE FLAGGING REMAINS IN PLACE AND THE AREA REMAINS <br />UNDISTURBED. REPLACE ALL DAMAGED FLA66IN6 IMMEDIATELY. <br />ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS: <br />STABILIZE CONSTRUCTION ACCESS (BMP 205): CONSTRUCTION VEHICLE <br />AGCE55/EXIT SHALL BE LIMITED TO MAIN ENTRANCE. PROVIDE PAVEMENT <br />5WEEPIN6 OF ENTRANCE/EXIT PERIODICALLY DURING CONSTRUCTION TO <br />PREVENT SEDIMENT BEIN6 TRACKED OFF -SITE. <br />ELEMENT 3: CONTROL FLOW RATES: <br />NOT APPLICABLE TO PROPOSED PROJECT. <br />ELEMENT 4: INSTALL SEDIMENT CONTROLS: <br />WATTLES (BMP 0235): INSTALL WATTLE RING AT CATCH BASINS TO <br />PREVENT SEDIMENT LADEN STORM WATER ENTERIN6 STORM WATER DRAINA6E <br />SYSTEM. <br />ELEMENT 5: STABILIZE SOILS: <br />DUST CONTROL (BMP C140): PROVIDE PERIODIG WATERING/SPRINKLING OF <br />CON5TRUCTION AREA TO PREVENT WIND TRANSPORT OF DUST. <br />ELEMENT 6: PROTECT SLOPES: <br />TEMPORARY AND PERMANENT 5EEDIN6 (BMP G120): PROVIDE 6RA55 <br />5EEDIN6 OF CONSTRUCTION AREA TO REDUCE EROSION OF EXPOSED SOILS. <br />ELEMENT 7: PROTECT DR <br />AIN INLETS: <br />STORM <br />MP 0220 : INSTALL STORM DRAIN <br />N <br />5 DR <br />AIN INLET <br />PROTECTION (B) <br />I N AND CLE <br />AN <br />IN <br />N PER DETAIL THIS D RAWIN6 . MAINTA INLETPROTECTION <br />INLET PROTECTION DURING GONSTRUGTION TO PREVENT SEDIMENT LADEN <br />WATER FROM ENTERING CRITICAL AREAS AND WATERWAYS. <br />T <br />ELEMENT 8: STABILIZE CHANNELS AND OUTLETS: <br />OUTLET PROTECTION (BMP 020q): PROVIDE RIPRAP 5PLA5HPAD AT STORM <br />A CHANNEL. <br />UT VE <br />NT ER05I <br />ON 0 F OUTF LL <br />DRAIN OUTLET <br />T A5 REQUI <br />RED TO PRE <br />L <br />PROVIDE 6'x6'xl FOOT THICK 5PLA5HPAD WITH 2" TO 8" RIPRAP AT <br />OUTLET AS REQ <br />UIRED. <br />0 <br />EL EMENT q• CONTROL POLLU <br />TANTS: <br />CONCRETE1) HANDLIN6 (BMP G15 WA5HIN6 AND MAINTENANCE OF <br />CONSTRUCTION EQUIPMENT IN AREA OF CONSTRUCTION ONLY. DO NOT <br />ALLOW WASHOOWN AREAS TO DRAIN DIRECTLY TO NATURAL OR CONSTRUCTED <br />STORMWATER CONVEYANCES. <br />ELEMENT 10: CONTROL DE -WATERING: <br />NOT APPLICABLE TO PROP05ED PROJECT. <br />ELEMENT 11: MAINTAIN BMPS. <br />MATERIALS ON HAND (BMP G150): KEEP QUANTITIES OF ER05ION <br />PREVENTION AND SEDIMENT CONTROL MATERIALS ON PROJECT SITE AT ALL <br />TIMES TO BE USED FOR RE6ULAR MAINTENANCE AND EMER6ENCY <br />SITUATIONS SUCH AS UNEXPECTED HEAVY RAINS. <br />CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (BMP C1(o0): CONTACT <br />GESGL AS REQUIRED DURING CONSTRUCTION TO ENSURE COMPLIANCE WITH <br />SWPPP AND DEPARTMENT OF ECOL06Y REQUIREMENTS. <br />ELEMENT 12: MANAGE THE PROJECT. <br />MATERIALS ON HAND (BMP G150): KEEP QUANTITIES OF EROSION <br />PREVENTION AND SEDIMENT CONTROL MATERIALS ON PROJECT SITE AT ALL <br />TIMES TO BE USED FOR RE6ULAR MAINTENANCE AND EMER6ENCY <br />5ITUATION5 SUCH AS UNEXPECTED HEAVY RAINS. <br />CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (BMP 0160): <br />PHA5IN6 OF CONSTRUCTION DEVELOPMENT PROJECTS SHALL BE PHASED <br />WHERE FEASIBLE IN ORDER TO PREVENT SOIL EROSION AND TO THE <br />MAXIMUM EXTENT PRACTICABLE, THE TRANSPORT OF SEDIMENT FROM THE <br />SITE DURIN6 CONSTRUCTION. RE-VE6ETATION OF EXPOSED AREAS AND <br />MAINTENANCE OF THAT VE6ETATION SHALL BE AN INTE6RAL PART OF THE <br />GLEARIN6 ACTIVITIES FOR ANY PHASE. <br />SCHEDULIN6 (BMP 162): CONSTRUCTION SHALL PROCEED A5 5EQUENGED <br />ABOVE. CONTRACTOR SHALL SEQUENCE THE PROJECT TO REDUCE THE <br />AMOUNT AND DURATION OF SOIL EXPOSED TO EROSION BY WIND, RAIN, <br />RUNOFF, AND VEHICLE TRAGKIN6. <br />ELEMENT 15: PROTECT LOW IMPACT DEVELOPMENT: <br />BUFFER ZONES (BMP 0102): PRIOR TO BEGINNING LAND DI5TURBIN6 <br />ACTIVITIES, IDENTIFY 4 CLEARLY MARK WITH 5I6N5, GONSTRUGTION <br />FENGIN6, OR FLA66IN6 ALL BUFFER ZONES, VE6ETATION, AND TOPSOIL <br />THAT SHOULD NOT BE DISTURBED. INSPECT THE AREA FREQUENTLY TO <br />MAKE SURE FLAG6IN6 REMAINS IN PLACE AND THE AREA REMAINS <br />UNDISTURBED. REPLACE ALL DAMAGED FLA66I46 IMMEDIATELY. <br />SWPPP PLAN: <br />VOLUME II, CHAPTER 4 OF THE FEBRUARY 2014 DEPARTMENT OF EWL06Y <br />5TORMWATER MANAGEMENT MANUAL FOR WESTERN WA5HIN6TON PROVIDES THE <br />BEST MANAGEMENT PRACTICES (BMPS). THIS 5WPPP SITE PLAN SHALL BE <br />P05TED AND MAINTAINED ON THE CONSTRUCTION SITE. <br />CONTACTS: <br />OWNER: <br />BLUNT FAMILY, L.L.G. <br />7106 RIVERVIEN RD. <br />SNOHOM I SH , WA q 82cf 0 <br />CONTACT: MR. GORY BURKE <br />(425) 544-4041-1 <br />GE5CL: <br />WAN ELLIN6HAU5, ID #65520 <br />2812 COLBY AVE. <br />EVERETT, WA aa2OI <br />(425) 252-2155 <br />PO�IEGT CRITERIA <br />TAX ACCOUNT NO.: 2g050800102000 <br />LEGAL DESCRIPTION: <br />SECTION OS TOWNSHIP 21 RAN6E 05 LOT 3 OF EVERETT DELTA <br />WEST PROPERTIES 55P NO 1-15 REG AFN g812235013 <br />AMENDED AF NO 1gllOg225011 4 BEIN6 PTN NE1/4 50 SEC. <br />ZONING: M-2 HEAVY MANUFACTURIN6 <br />COMPREHENSIVE PLAN: 5.1 HEAVY INDUSTRIAL <br />5ITE AREA: 1.14 ACRES <br />CONSTRUCTION SEOUENOE: <br />1. ATTEND PRE -CONSTRUCTION MEETIN6. <br />2. FLAG GLEARIN6 LIMITS. <br />3. INSTALL EROSION CONTROL MEASURES PER PLAN. <br />4. INSTALL IMPROVEMENTS/EXPORT MATERIAL. <br />5. MONITOR, MAINTAIN, AND PROTECT ALL ER05ION CONTROL BMPS. <br />6. ALL TEMPORARY BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER <br />FINAL 5ITE STABILIZATION I5 ACHIEVED OR AFTER THE TEMPORARY <br />BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED <br />OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM <br />REMOVAL SHALL BE PERMANENTLY STABILIZED. <br />EROSION AND SEDIMENfi CONTROL NOTES <br />APPROVAL OF THE ER05ION/5EDIMENT CONTROL (ESG) PLAN DOES NOT <br />ROAD OR DRAI NA6E DE5I6N <br />APPROVAL OF PERMANENT <br />CONSTITUTE AN AP L <br />(E.6. SIZE AND LOCATION OF ROADS, PIPES, RESTRIGTOR5, <br />ETC.). <br />FACILITIES, UTILITIES, <br />RETENTION L) CHANNELS, <br />, <br />P AN AND THE CONSTRUCTION, <br />F THESE E5G PLANS 0 <br />THE IMPLEMENTATION <br />MAINTENANCE, REPLACEMENT, AND UP6RADIN6 OF THESE E50 <br />APP NTRACTOR <br />FACILITIES I5 THE RE5PON5IBIL ITV IGATGO <br />OF THE L / <br />UNTIL ALL CONSTRUCTION I5 COMPLETED AND APPROVED AND <br />VE6ETATION/ LAND50APIN6 I5 ESTABLISHED. <br />THE BOUNDARIES OF THE GLEARIN6 LIMITS SHOWN ON THIS PLAN <br />N <br />SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. <br />DURING CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE <br />FL.A66ED GLEARIN6 LIMITS SHALL BE PERMITTED. THE FLA66IN6 <br />SHALL BE MAINTAINED BY THE APPLICANT. <br />THE E50 FAGILITIE5 SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN <br />CONJUNCTION WITH ALL GLEARIN6 ACTIVITIES, AND IN SUCH A <br />MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER <br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAY5, OR VIOLATE <br />APPLICABLE WATER STANDARDS. <br />THE E5C FAGILITIE5 SHOWN ON THIS PLAN ARE THE MINUMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE <br />CONSTRUCTION PERIOD, THESE E50 FAGILITIE5 SHALL BE UPGRADED <br />AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT <br />SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />THE E50 FAGILITIE5 SHALL BE INSPECTED ONLY BE THE <br />APPLICANT/GONTRAGTOR AND MAINTAINED AS NECESSARY TO ENSURE <br />THEIR CONTINUED FUNCTIONIN6. <br />THE ESG FAGILITIE5 ON INACTIVE 5ITES SHALL BE INSPECTED AND <br />MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 15 HOURS <br />FOLLOWIN6 A MAJOR STORM EVENT. <br />AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED <br />TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS <br />AND CONVEYANCE LINES SHALL BE GLEANED PRIOR TO PAYING. THE <br />GLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO <br />T1-E DOWNSTREAM SYSTEM. <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE <br />BE6INNIN6 OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF <br />THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE <br />THAT ALL PAVED AREAS ARE KEPT GLEAN FOR THE DURATION OF THE <br />PROJECT. <br />VICINITNr MAF <br />NOT TO SCALE <br />�JTE <br />L— <br />NORTH <br />J <br />a <br />m <br />�m[L <br />z <br />LL <br />IL <br />O <br />L <br />cn <br />LLt, <br />IL <br />tcu <br />r <br />e� <br />Lp <br />E <br />0 <br />U <br />a) <br />L <br />a) U <br />c o 0. <br />j N M <br />147) <br />U <br />Qrn� <br />> N ' a , N <br />4 �- <br />0 <br />ao <br />U <br />N <br />N <br />N a)Ln <br />.-. <br />N N <br />co <br />NW�..� <br />non <br />F <br />0 <br />\W <br />W_ <br />W <br />z_ <br />CQ <br />G <br />L. <br />o <br />`1 <br />>' <br />04 <br />00 <br />m <br />o c <br />c <br />� <br />L O <br />> <br />0 <br />� <br />L CzU <br />cc <br />4 <br />L <br />N <br />z <br />J <br />W <br />Q <br />W <br />Drawing: <br />Job Number: <br />z <br />Q <br />a <br />O_ <br />F- <br />w <br />Of <br />a <br />O <br />f•- <br />J <br />w <br />F>- <br />O <br />W m <br />C <br />U <br />16c-3741 <br />