Laserfiche WebLink
• i i <br /> PROJECT DESCRIPTION <br /> THE PURPOSE OF THIS PROJECT IS TO PROPOSE AN ANTENNA <br /> MODIFICATION ON AN EXISTING WIRELESS SITE. <br /> TOWER SCOPE OF WORK <br /> Both LTE & NR must be on the same CPRI Rate7. 1st LTE CPRI <br /> should be SFP7 (NEQ.20022) on both Radio and ABIA sides for <br /> AirScale RRH (AHLBA, AHLBBA, AHFIB, AHCA, AHNA) and SFP7 <br /> (CEQ.16446 or NEQ.20022) on both Radio and ABIA sides for <br /> ALU radios (UHFA, UHIE). The 2nd 5G CPRI should be SFP7 <br /> (NEQ.20022/NEQ.53020) on both Radio and ABIL/ABIO sides for <br /> Airscale and ALU radios. Add 2nd CPRI connection for all <br /> bands/radio that is missing. 'n77 Band requires (2) CPRI <br /> connections (CEQ.24407) on both Radio and ABIO sides. <br /> Contractor to maintain RRH to back of antenna clearance and <br /> 14/B29 & n77 antenna separation per latest AT&T guidelines. <br /> • REMOVE (6) ANTENNAS <br /> • REMOVE (6) RRHs <br /> • REMOVE (6) TMAs <br /> • INSTALL (6) ANTENNAS. <br /> • INSTALL (6) RRHs <br /> GROUND SCOPE OF WORK <br /> • RELOCATE 4T4R 85 AHCA RRH TO TOWER <br /> • EXISTING FSM4 (AMIA) — UTILIZE EXISTING (1) ASIA AND (3) <br /> ABIA CARDS ON THE Cl SIDE FOR LTE. REMOVE EXISTING (1) <br /> ASIK AND (1) ABIL CARDS ON THE C2 SIDE. ADD (1) ASIL <br /> AND (2) ABIO CARDS TO THE C2 SIDE FOR 5G <br /> 850/1900/AWS & 5G C n77 <br /> � 12 <br />