Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 75 <br />1-06.2(2)D Quality Level Analysis <br />Delete 1-06.2(2)D. <br />1-06.3 Manufacturer’s Certificate of Compliance <br />Supplement 1-06.3 by adding the following: <br />When authorized by the Standard Specifications or these Special Provisions and prior <br />to use, the Engineer may accept certain Equipment on the basis of a Manufacturer’s <br />Certificate of Compliance as an alternate to Equipment inspection and testing. <br />A Manufacturer’s Certificate of Compliance shall be reserved for cases where <br />compliance to Contract requirements is not readily determinable through inspection and <br />testing of materials or Equipment. The Contractor shall provide properly authenticated <br />documents to the City’s Representative that the materials and Equipment comply with <br />the Contract requirements. <br />The Contractor shall pay all associated costs of providing each Manufacturer’s <br />Certificate of Compliance submitted for City acceptance. <br />The City reserves the right to refuse to accept Equipment on the basis of a <br />Manufacturer’s Certificate of Compliance. <br />1-06.3(1) Inspection at Point of Manufacturing <br />(******) <br />The Contractor shall be responsible to reimburse the City for the costs of inspections at <br />the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br />Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br />Contractor include, but are not limited to, travel, subsistence, labor and lodging <br />expenses of the City Inspector. <br />Point of manufacturing inspection will be required if: <br />Inspection and testing of materials or Equipment in the vicinity of the Work by the <br />City is not practicable, <br />The Contractor requests the City to inspect and test material or Equipment at the <br />point of manufacture, or <br />The Standard Specifications or these Special Provisions require that inspection, <br />testing or witnessing of tests take place at the point of manufacture. <br />1-06.4 Handling and Storing Materials <br />Supplement 1-06.4 by adding the following: <br />Contractor shall store materials and Equipment so as to insure the preservation of their <br />quality and fitness for the Work. Contractor shall store Equipment and materials at <br />location that facilitates inspection. The Contractor shall be responsible for damages, <br />loss or casualty occurring to materials and Equipment until Final Acceptance. <br />1-06.6 Recycled Materials <br />Delete 1-06.6 and its subsections and substitute the following: <br />The Contractor shall make best effort to utilize recycled materials in the construction of <br />the project as detailed in elsewhere in the Standard Specifications and these Special <br />Provisions. <br />Prior to Physical Completion Contractor shall report the quantity of recycled materials <br />utilized in the construction of the project for each of the items listed in Section 9-03.21. <br />Include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag <br />and other recycled materials (e.g. utilization of on-site material and aggregates from <br />concrete returned to the supplier). Contractor shall provide report on DOT form 350- <br />075A Recycled Materials Reporting.