My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 95 <br />1-07.23(1) Construction Under Traffic <br />Revise the third sentence of the second paragraph to read as follows: <br />Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br />may allow activating pedestrian recall timing or other accommodations during <br />construction. <br />Supplement 1-07.23(1) by adding the following: <br />If Engineer determines the permitted closure hours adversely affect traffic, the <br />Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br />in writing of any change in the closure hours. <br />No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br />p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br />as having a holiday fall on Friday, Saturday, Sunday or Monday. <br />Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br />situations as determined by the Engineer. The uniformed officer shall be paid under <br />contract item "Traffic Control – Off-Duty Police Officer.” <br />Contractor shall notify the local Fire, Police and Engineering Departments before <br />the beginning of each phase of construction so that these agencies may re-route <br />their emergency vehicles around the construction zone. The non-emergency phone <br />number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br />Works Engineering is 257-8800. <br />Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br />Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br />to enable rerouting of buses. <br />Contractor shall notify the property owners at least 72 hours in advance to enable them <br />to remove vehicles parked in the vicinity of Work. Towing vehicles shall be the <br />responsibility of the Contractor and no additional payment will be made. <br />Further supplement 1-07.23(1) by adding the following: <br />1-07.23(1)A General Requirements Traffic <br />(******) <br />The following general requirements apply to all Work on the Project: <br />Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br />10.2(2) TRAFFIC CONTROL PLANS. <br />Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br />construction constraints resulting from traffic control. <br />Notify all affected property owners prior to commencing the barricading of <br />streets, sidewalks and driveways. <br />All business driveways shall remain open except as necessary to permit curing <br />of construction materials or for short periods of time as required for <br />excavations. However, at least one driveway per business shall remain open <br />to vehicular traffic at all times unless otherwise approved by the Engineer and <br />affected property owner in writing. <br />Signs and barricades shall be supplemented by lanterns or flasher units during <br />the hours of darkness. <br />Drivers of motor vehicles used in connection with the construction shall obey <br />traffic rules posted for such location in the same manner and under the same <br />restrictions as provided for the drivers of private vehicles.
The URL can be used to link to this page
Your browser does not support the video tag.