My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 104 <br />together to form schedule are not permitted. Electronic copies shall be <br />submitted on either separate CD-ROMs or as email attachment to City’s <br />Representative or as otherwise acceptable to the City Representative. <br />5. Updated Progress Schedules shall indicate progress of the Work to the <br />date of submission by drawing a vertical line down the schedule to <br />represent Work completed to date. <br />1-08.3(3)B Schedule Contents <br />All Progress Schedules shall: <br />1. Include essential sub-schedules of related activities. <br />2. Allow for timely incorporation of any other's work under separate contract <br />with City. <br />3. Allow for timely incorporation of work provided and installed by City. <br />4. Include submittals to agencies required for performance of Work with <br />sufficient, adequate and reasonable time for review, comment and return <br />submittals. <br />5. Allow for appropriate durations to complete activities that may be affected <br />by weather during the time of year the activities are performed. <br />6. Identify logical connections, dependency upon preceding or succeeding <br />activities, restraints or constraints, planned start and completion dates, <br />duration, actual start and completion dates, and variances. <br />7. Activity durations shall not exceed twenty (20) days. The activities shall <br />be related to early and late start, early and late finish, and Float dates. <br />Activities listed in the Preliminary Schedule shall be included in all subsequent <br />schedules. No activity in the Preliminary Schedule shall be deleted without prior <br />written consent of the Representative and City. <br />Contractor shall notify City’s Representative and City in writing and highlight the <br />addition of all activities to the schedule after the Preliminary Schedule. <br />The Baseline Schedule shall be part of the Contract. <br />Each activity shall be identified with a number that incorporates the Specification <br />section number. <br />Activities shall be consistent and identified with the Schedule of Values (if <br />applicable) or unit prices of the bid schedule. All elements and items in the <br />Schedule of Values or unit prices in the bid schedule shall appear in the Progress <br />Schedules. <br />Contractor shall provide sub-schedules for each stage/phase of Work as required <br />by City, City’s Representative, or Subcontractor. <br />Contractor shall provide sub-schedules to define major portions of the entire <br />schedule. Include long-lead-time items for Equipment and material that requires <br />long fabrication time. Order these well in advance of required delivery time to <br />sequence with overall construction schedule. <br />Each schedule shall show accumulated percentage of completion of each activity, <br />and total percentage of Work completed, as of the date of payment application. <br />Contractor shall include in each schedule as activities the submission, review, and <br />correction of Submittals, Shop Drawings, Product Data and Samples. The <br />schedule should show: <br />1. The dates for Contractor's Submittals.
The URL can be used to link to this page
Your browser does not support the video tag.