My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 113 <br />Contractor shall furnish a written schedule for completing the physical Work on the <br />Contract. <br />1-08.10 Termination of Contract <br />1-08.10(1) Termination for Default <br />Delete all of 1-08.10(1) and substitute the following: <br />The City may terminate the Contract upon written notice to Contractor and its Surety <br />whenever the Contractor is deemed to be in default or fails to fulfill, in a timely and <br />proper manner, one or more Contract obligations, or is in violation of any provisions <br />or covenants of the Contract. Termination shall be effective upon Contractor’s and <br />Surety’s receipt of such notice <br />For purposes of this section, the Contractor shall be deemed to be in default upon <br />the occurrence of one or more of the following events: <br />1. If Contractor is bankrupt or insolvent. <br />2. If Contractor makes a general assignment for the benefit of creditors. <br />3. If a trustee or receiver is appointed for Contractor, or for any of <br />Contractor's property. <br />4. If Contractor files a petition to take advantage of any debtor's law, or to <br />reorganize under any bankruptcy chapter or law. <br />5. If Contractor repeatedly fails to make prompt payments to subcontractors <br />or others for labor, materials, or Equipment. <br />6. If Contractor disregards laws, ordinances, rules, regulations, or orders of <br />public bodies having jurisdiction. <br />7. If Contractor disregards the authority of the City or City’s Representative. <br />8. If Contractor substantially violates the provisions of the Contract <br />Documents or fails, neglects, or refuses to proceed in compliance with <br />the provisions of the Contract Documents. <br />9. If the Contractor made material misrepresentations to the City with <br />respect to: (a) its qualifications or those of its subcontractors; (b) its or its <br />subcontractors’ ability to perform the Work in a timely, workmanlike <br />manner; (c) the materials installed or to be installed; or (d) progress pay <br />estimates. <br />10. If Contractor fails to supply sufficient skilled workers or suitable materials <br />or equipment. <br />11. If Contractor refuses or fails to prosecute the Work with such diligence as <br />will ensure its Physical Completion within the original Physical <br />Completion time and any extensions of time which may have been <br />granted to the Contractor by change order or otherwise. <br />12. If Contractor disregards laws, ordinances, rules, codes, regulations, <br />orders or similar requirements of any public entity having jurisdiction. <br />13. If Contractor performs Work which deviates from the Contract. <br />14. If Contractor otherwise violates in any material way any provisions or <br />requirements of the Contract. <br />After termination of the Contractor for default, the City may transfer performance of <br />the Work to the Contractor's Surety or elect to prosecute to completion by contract <br />or otherwise. <br />If the City chooses to provide such sufficiency of labor or materials as required to <br />complete the Work, the City may exclude the Contractor from the site and take
The URL can be used to link to this page
Your browser does not support the video tag.