My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 126 <br />without the City’s written authorization. The City will issue a check <br />representing the sum of the monies reserved, payable to the bank or trust <br />company. Such check shall be converted into bonds and securities chosen by <br />the Contractor as the interest accrues <br />The Contractor shall designate the option desired at the time the Contract is executed. <br />If the Contractor in chooses option 2, deposit in escrow account, Contractor agrees to <br />assume full responsibility to pay all costs that may accrue from escrow services, <br />brokerage charges or both, and further agrees to assume all risks in connection with the <br />investment of the retained percentages in securities. The City may also, at its option, <br />accept a bond in lieu of retainage. <br />Retainage will be released when all of the following conditions are satisfied: <br />1. Sixty days have elapsed following the completion of all Work specified in the <br />Contract; and <br />2. The Contractor fulfilled all of all obligations of the Contractor under the <br />Contract, including, but not limited to, the Contractor’s furnishing all <br />documentation required by Contract and law; and <br />3. A release has been obtained from the Washington State Department of <br />Revenue; and <br />4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file <br />with the City (RCW 39.12.040); and <br />5. A release has been obtained from the Washington State Department of Labor <br />& Industries and the Washington State Employment Security Department; <br />and <br />6. All claims, as provided by law, filed against the retainage have been resolved. <br />In the event claims are filed and provided the conditions one through five are <br />met, the Contractor will be paid the retained percentage less an amount <br />sufficient to pay any such claims together with a sum determined by the City <br />sufficient to pay the cost of claims and attorney’s fees. <br />7. All other conditions required by law are satisfied. <br />1-09.11 Disputes and Claims <br />Delete all of 1-09.11 and substitute the following: <br />1-09.11(1) Disputes <br />(******) <br />When a Dispute occurs during the Contract, the Contractor shall pursue resolution <br />through the City's Representative. The Contractor shall follow the procedure outlined in <br />section 1-09.11(2) CONTRACT CLAIMS herein and 1-08.3 PROGRESS SCHEDULE <br />and 1-08.8 EXTENSIONS OF TIME for issues regarding the schedule and Contract <br />Time. Timely and adequate Notice is a condition precedent to a Contract Claim. Timely <br />and complete submission of a Contract Claim is a condition precedent to any entitlement <br />by the Contractor to an adjustment of Contract Sum or Contract Time. Unless waived in <br />writing by the City, mediation is a condition precedent to the filing of any lawsuit, action <br />or proceeding that seeks to recover on a Contract Claim, whether in whole or in part. <br />The costs of any such mediation will be borne equally by the parties. Unless otherwise <br />agreed by the parties, the mediation shall take place in Everett, Washington.
The URL can be used to link to this page
Your browser does not support the video tag.