My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 133 <br />1-09.11A(4)A1b No Material Variations <br />To demonstrate the Contractor’s Overhead costs did not materially vary <br />from its usual seasonal Overhead costs during the period of Delay in <br />accordance with item 4 of 1-09.11A(4)A1 of these Special Provisions, the <br />Contractor shall; <br />1. Affirmatively represent and warrant that the completion of the <br />subject Work was extended and that such extension prevented <br />the performance of other work during both the period of Delay <br />and the later period of time required to complete the extended <br />Work, <br />2. Disclose the details of Contractor generated billings and <br />Contractor Overhead Costs, as defined in these Special <br />Provisions, throughout the actual Project performance. The <br />details of such information should be no less than specific <br />identification of the sources and amounts of revenue on no <br />greater than a monthly basis and specific identification of the <br />types and amounts of Contractor Overhead Costs on no greater <br />than a monthly basis for the actual Project duration. <br />1-09.11A(4)A1c Overabsorbed Overhead <br />To demonstrate that Contractor did not incur Overabsorbed Overhead in <br />the period following the Delay, in accordance with item 5 of 1- <br />09.11A(4)A1. of these Special Provisions, the Contractor shall: <br />1. Affirmatively represent and warrant that completion of the <br />delayed Work prevented the performance of other Work; <br />2. Identify the critical resource unavailable for other Work due to <br />completion of the delayed Contract; and <br />3. Showing that unavailability of this critical resource precluded the <br />performance of other Work. <br />1-09.11A(5) Inefficiencies <br />1-09.11A(5)A Adjustment of Contract Sum <br />To the extent Contractor is entitled to an increase in Contract Sum because of <br />inefficiencies or impaired productivity, then compensation due, if any, shall be <br />calculated as provided in 1-09.4 EQUITABLE ADJUSTMENT. There is no <br />entitlement to increase in Contract Sum for inefficiencies to the extent caused <br />by a Third Party or a Force Majeure Event. <br />1-09.11A(5)B Adjustment of Contract Time <br />To the extent Contractor is entitled to an extension of Contract Time because <br />of inefficiencies or impaired productivity, then the extension shall be determined <br />as provided in 1-08.8 EXTENSIONS OF TIME. <br />Delete all of 1-09.12 and substitute the following: <br />1-09.12 Audits <br />(******) <br />1-09.12(1) General <br />The Contractor’s records relating to this Project, including, but not limited to, wage, <br />payroll, and cost records, shall be open to inspection or audit by representatives of the <br />City during the Project and for a period of not less than six years after the date of Final <br />Acceptance of the Contract. The Contractor shall retain these records for that period. <br />The Contractor shall also guarantee that Project records of Subcontractors, suppliers,
The URL can be used to link to this page
Your browser does not support the video tag.