Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 139 <br />There shall be no separate classification of signs. All construction signs, whether used <br />throughout the construction, during a major phase of construction or removed daily shall <br />be paid under the item "Maintenance and Protection of Traffic Control.” Portable or <br />temporary mountings may require added weight for stability. If it is necessary to add <br />weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br />bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br />more than 1-foot from the ground. <br />The Work to provide the construction signing shall be: <br />1. Furnishing all construction signs. <br />2. Furnishing, removing, and disposing of the posts or supports for the signs. <br />3. Initial installation and subsequent removal of all construction signs. <br />4. Furnishing labor and materials for maintaining the signs in a clean and <br />presentable condition; <br />5. All other incidentals necessary for providing the construction signs according <br />to the approved traffic control plan(s). <br />Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br />to be unacceptable, while their use is required on the project, shall be replaced by the <br />Contractor without additional compensation. <br />1-10.4 Measurement <br />Delete 1-10.4 and substitute the following: <br />1-10.4 Measurement <br />1-10.4(1) General <br />(******) <br />When the Bid Proposal does not include an item for any necessary traffic control, all <br />costs for traffic control shall be included, by the Contractor, in the unit contract price for <br />the various other items of Work in the Bid Proposal. The Contractor shall estimate these <br />costs based on the contemplated work procedures. <br />When traffic control items are included in the Bid Proposal, payment is limited to the <br />following areas: <br />The entire project area under the Contract and for a distance to include the initial warning <br />signs for the beginning of the Project and the end of construction. Warning signs for <br />side roads on the approved traffic control plan are also included. If the project consists <br />of two or more sections, the limits will apply to each section individually. <br />A detour provided in the Plans or approved by the Engineer for by-passing all or any <br />portion of the construction, irrespective of whether or not the termini of the detour are <br />within the limits of the Contract. <br />The provisions of Section 1-04.6 will not apply to traffic control or traffic control items. <br />However, the item "Maintenance and Protection of Traffic Control" will be considered for <br />an equitable adjustment only when the total Contract price increases or decreases by <br />more than 25 percent. <br />The measurement and payment for the items included in the Bid Proposal for traffic <br />control costs incurred within the limits of 1 and 2 above will be made to the Contractor <br />by the City as described in these Special Provisions.