My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47-Beverly Lake Sewer Replacement Division 2 – EARTHWORK February 7, 2025 <br />WO No. – UP3529 SP – 139 <br /> DIVISION 2 – EARTHWORK <br />2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br />2-01.2 Disposal of Usable Material and Debris <br />Supplement 2-01.2 by adding the following: <br />When requested by the property owner, trim trees of sufficient size for fire wood, cut <br />into two-foot rounds and neatly stack on adjacent property. Remove and dispose of <br />stumps, large roots, limbs and branches. <br />2-01.2(1) Disposal Method No.1 – Open Burning <br />Delete the first paragraph and substitute the following. <br />Opening burning is not permitted within the city limits. <br />2-01.4 Measurement <br />Delete all paragraphs of 2-01.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-01.5 Payment <br />Delete all paragraphs in 2-01.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br />be included with other work with no direct compensation made. <br />2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br />2-02.1 Description <br />Delete 2-02.1 and substitute the following: <br />The Work shall consist of the removal, disposal or abandoning in-place of various <br />existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br />curb and gutter, gutter, valves, manholes, catch basins and other items necessary for <br />the accomplishment of the improvement. <br />All Work with asbestos-cement pipe shall conform to the "Recommended Standard <br />Asbestos-Cement Pipe Work Practice Procedure and Training Requirements," latest <br />edition, as published by the American Water Works Association, Pacific Northwest <br />Section. Remove and dispose of Asbestos-Cement pipe in accordance with the <br />practices specified by the State of Washington Department of Ecology and the <br />Snohomish County Solid Waste Division. <br />2-02.3 Construction Requirements <br />2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br />Supplement 2.02.3(2) by adding the following: <br />When removing structures such as manholes, inlets, or vaults that interfere with <br />the construction, properly plug all pipe openings abandoned in-place watertight <br />with Commercial Concrete, or with mortar and masonry, blocks or brick. <br />Backfill voids with suitable job excavated material where structures are removed. <br />Compact suitable backfill material in accordance with 2-03.3(14)C.
The URL can be used to link to this page
Your browser does not support the video tag.