My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47-Beverly Lake Sewer Replacement Division 2 – EARTHWORK February 7, 2025 <br />WO No. – UP3529 SP – 147 <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-09.5 Payment <br />Delete all paragraphs in 2-09.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />When there is no bid item for “Structure Excavation” in the Proposal, all Work in this <br />section shall be included with the respective Bid Items of the Contract with no direct <br />compensation made. <br />2-11 TRIMMING AND CLEANUP <br />2-11.3 Construction Requirements <br />Supplement 2-11.3 by adding the following after item 6: <br />7. Keep work areas and City streets clean and free from mud, dirt and other debris. <br />Further supplement 2-11.3 by adding the following: <br />Keep the Project site in a neat and orderly condition during the process of construction <br />with as little disruption to the adjoining properties as practical under the conditions. <br />Promptly and as often as needed cleanup debris resulting from Contractor’s operations <br />from drainage facilities such as inlets, catch basins, culverts and open ditches. <br />Remove and dispose of all construction stakes. <br />Upon Project completion, clean Project area and neatly dress slopes to present a <br />uniform appearance blending into the contour of adjacent properties. Remove trash of <br />all kinds resulting from construction operations. <br />2-11.4 Vacant <br />Revise 2-11.4 to read as follows: <br />2-11.4 Measurement <br />Delete all paragraphs in 2-11.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-11.5 Payment <br />Delete all paragraphs in 2-11.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />When there is no bid item for “Trimming and Cleanup” in the Proposal, all Work in this <br />section shall be included with other Work with no direct compensation made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.