My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS 47 – Beverly Lake Sewer Replacement Table of Contents - February 7, 2025 <br />WO No. – UP3529 SP - i <br /> <br />Table of Contents <br /> Lift Station 47 – Beverly Lake Sewer Replacement Project <br />Table of Contents ..................................................................................................................... i <br />ADVERTISEMENT FOR BIDS .................................................................................................. 1 <br />DIVISION 1 – GENERAL REQUIREMENTS ........................................................................... 37 <br />General Description and Location of Project (******) ............................................................................. 37 <br />Design Engineer (******) ........................................................................................................................ 37 <br />Standard Specifications .......................................................................................................................... 37 <br />1-01 DEFINITIONS AND TERMS ..................................................................................................... 38 <br />1-01.3 Definitions ............................................................................................................................................. 38 <br />1-02 BID PROCEDURES AND CONDITIONS ................................................................................. 42 <br />1-02.1 Prequalifications of Bidders .................................................................................................................. 42 <br />1-02.1 Bidder Responsibility Criteria (******) ................................................................................................... 42 <br />1-02.4 Examination of Plans, Specifications, and Site of Work ....................................................................... 43 <br />1-02.5 Proposal Form ...................................................................................................................................... 45 <br />1-02.6 Preparation of Proposal ........................................................................................................................ 45 <br />1-02.7 Bid Deposit ............................................................................................................................................ 46 <br />1-02.8 Noncollusion Declaration and Lobbying Certification ........................................................................... 46 <br />1-02.9 Delivery of Proposal .............................................................................................................................. 46 <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal............................................................................. 46 <br />1-02.12 Public Opening of Proposals ................................................................................................................ 47 <br />1-02.13 Irregular Proposals ............................................................................................................................... 47 <br />1-02.14 Disqualification of Bidders .................................................................................................................... 48 <br />1-02.15 Pre-Award Information .......................................................................................................................... 48 <br />1-03 AWARD AND EXECUTION OF CONTRACT ........................................................................... 49 <br />1-03.1 Consideration of Bids ............................................................................................................................ 49 <br />1-03.2 Award of Contract ................................................................................................................................. 49 <br />1-03.3 Execution of Contract ........................................................................................................................... 50 <br />1-03.4 Contract Bond ....................................................................................................................................... 50 <br />1-03.5 Failure to Execute Contract .................................................................................................................. 51 <br />1-03.6 Return of Bid Deposit ............................................................................................................................ 51 <br />1-03.7 Judicial Review ..................................................................................................................................... 51 <br />1-04 SCOPE OF THE WORK ........................................................................................................... 51 <br />1-04.1 Intent of the Contract ............................................................................................................................ 51 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda .......... 52 <br />1-04.3 Reference Information .......................................................................................................................... 53 <br />1-04.4 Changes ................................................................................................................................................ 53 <br />1-04.4 Changes ................................................................................................................................................ 53 <br />1-04.5 Procedure, Protest, and Dispute by the Contractor .............................................................................. 54 <br />1-04.5 Notice by Contractor (******) ................................................................................................................ 55
The URL can be used to link to this page
Your browser does not support the video tag.