My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 23 <br /> <br />Bid Item 47 - EXTRUDED CEMENT CONCRETE CURB <br /> Measurement and Payment: Unit Price per Linear Foot The unit contract price for EXTRUDED CEMENT CONCRETE CURB per linear foot shall be full compensation for all labor, material, tools, and equipment necessary to satisfactorily complete the work as defined in the Standard Specifications, Standard Drawings (Standard Drawing No. 311), these specifications and as shown on the Contract Plans and as directed by the Inspector. <br /> <br />The placement of EXTRUDED CEMENT CONCRETE CURB shall include, but is not <br />limited to, the following: base material, general earthwork, excavation (regardless of <br />depth) and removal of insitu materials, and other miscellaneous work. <br /> <br />The cost of removing and disposal of existing EXTRUDED CEMENT CONCRETE CURB <br />shall be considered incidental and included in the unit price for this bid item. <br /> Measurement for EXTRUDED CEMENT CONCRETE CURB shall be per Linear Foot (LF) as delineated by the Contractor and approved by the Inspector prior to removal. <br /> <br />Bid Item 48 - RESTORE CONCRETE SIDEWALK AND DRIVEWAY <br /> <br />Measurement and Payment: Unit Price per Square Yard (SY) <br />Measurement for RESTORE CONCRETE SIDEWALK AND DRIVEWAY shall be per square <br />yard as delineated by the Contractor and approved by the Inspector prior to removal. <br />The unit price per square yard for restoration of existing concrete sidewalks shall be full <br />compensation for final sawcut and all materials, tools, labor and equipment necessary to <br />complete the work in accordance with the Plans, COE Standard Drawings (Standard Drawing <br />No. 312 and Standard Drawing No. 315), Standard Specifications and these Special <br />Provisions. <br /> <br />Measurement for RESTORE CONCRETE SIDEWALK AND DRIVEWAY shall be per Square <br />Yard (SY) as delineated by the Contractor and approved by the Inspector. <br /> <br />Bid Item 49 - BLOCK WALL AT LIFT STATION SITE <br />Measurement and Payment: Unit Price per Square Foot (SF) <br />Payment for BLOCK WALL AT LIFT STATION SITE will be limited to dimensions and work <br />limits defined on drawings or as otherwise approved by the Inspector. <br /> <br />The unit price per Square Foot for installation of BLOCK WALL AT LIFT STATION SITE <br />shall be full compensation but is not limited to materials, tools, labor and equipment, finish <br />grading, base surfacing, compaction, formwork, concrete, cleanup, and other <br />miscellaneous and appurtenant work necessary to complete the work in accordance with <br />the Plans, COE Standard Drawings, Standard Specifications (6-13.3(5)) and these Special <br />Provisions. <br /> <br />Measurement for BLOCK WALL AT LIFT STATION SITE shall be per Square Foot (SF) as <br />delineated by the Contractor and approved by the Inspector.
The URL can be used to link to this page
Your browser does not support the video tag.