My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 25 <br /> <br /> <br />Bid Item 53 - TEMPORARY ROADWAY AND PARKING LOT PATCH <br />Measurement and Payment: Lump Sum (LS) <br />No measurement will be made for the lump sum item Temporary Roadway Patch. <br />Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br />regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br />relocated. The lump sum price shall be full compensation for all labor, material, tools and <br />equipment necessary to satisfactorily complete the Work as defined in Section 5-06.3(6) of <br />these Special Provisions and as shown on the Plans. <br /> <br />Bid Item 54 - PERMANENT PAVEMENT MARKING <br />Measurement and Payment: Lump Sum (LS) <br />This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br />other equipment necessary for restoring and replacing permanent traffic marking, including <br />and not limited to, stop bars, turn arrows, parking stalls lettering, crosswalks, reflectors, <br />delineators, and lane or fog-line striping removed or damaged by the Contractor’s work in <br />accordance with the COE Standard Drawing No. 720, Special Provisions and Plans. <br /> <br />Bid Item 55 - APPRENTICESHIP UTILIZATION <br />Measurement and Payment: Incentive Amount <br />This bid item includes the obligation of an Apprentice Utilization Requirement. Fifteen <br />percent or more of project Labor Hours shall be performed by Apprentices. Apprentice <br />Utilization will be determined using the L&I online Prevailing Wage Intent & Affidavit <br />(PWIA) system <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.