Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 25 <br /> <br /> <br />Bid Item 53 - TEMPORARY ROADWAY AND PARKING LOT PATCH <br />Measurement and Payment: Lump Sum (LS) <br />No measurement will be made for the lump sum item Temporary Roadway Patch. <br />Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br />regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br />relocated. The lump sum price shall be full compensation for all labor, material, tools and <br />equipment necessary to satisfactorily complete the Work as defined in Section 5-06.3(6) of <br />these Special Provisions and as shown on the Plans. <br /> <br />Bid Item 54 - PERMANENT PAVEMENT MARKING <br />Measurement and Payment: Lump Sum (LS) <br />This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br />other equipment necessary for restoring and replacing permanent traffic marking, including <br />and not limited to, stop bars, turn arrows, parking stalls lettering, crosswalks, reflectors, <br />delineators, and lane or fog-line striping removed or damaged by the Contractor’s work in <br />accordance with the COE Standard Drawing No. 720, Special Provisions and Plans. <br /> <br />Bid Item 55 - APPRENTICESHIP UTILIZATION <br />Measurement and Payment: Incentive Amount <br />This bid item includes the obligation of an Apprentice Utilization Requirement. Fifteen <br />percent or more of project Labor Hours shall be performed by Apprentices. Apprentice <br />Utilization will be determined using the L&I online Prevailing Wage Intent & Affidavit <br />(PWIA) system <br /> <br /> <br />