My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 43 <br />5. Prevailing Wage Training. Unless Bidder has completed three or more public works <br />projects and had a valid business license for three or more years, Bidder must have <br />received Department of Labor and Industries training on the requirements related to <br />public works and prevailing wage under RCW 39.12 and RCW 39.04. <br />5. Certification of Wage Compliance. Within the three-year period immediately <br />preceding the date of the bid solicitation, not have been determined by a final and <br />binding citation and notice of assessment issued by the department of labor and <br />industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of <br />chapter 49.46, 49.48, or 49.52 RCW. <br />6. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br />in RCW 39.04.320, not have been found out of compliance by the Washington state <br />apprenticeship and training council for working apprentices out of ratio, without <br />appropriate supervision, or outside their approved work processes as outlined in <br />their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br />immediately preceding the date of the bid solicitation. <br />1-02.1(2) Supplemental Bidder Responsibility Criteria <br />(******) <br />This Project will not be subject to supplemental bidder responsibility criteria. <br />1-02.2 Plans and Specifications <br />Delete all paragraphs in 1-02.2 and substitute the following: <br />Information as to where Bid Documents can be obtained or reviewed will be found in the <br />Call for Bids (Advertisement for Bids) for the Work. <br />After Award of the Contract, the Contractor will receive up to six sets of the reduced <br />Plans (11" x 17") and accompanying Special Provisions. In addition, the City will supply <br />up to three sets of full size plans (22" x 34"). All Plans and Special Provisions will be <br />conformed with addenda unless Contractor requests otherwise. <br />Additional Plans and Special Provisions may be purchased by payment of the current <br />printing costs. <br />1-02.4 Examination of Plans, Specifications, and Site of Work <br />1-02.4(1) General <br />Delete the fifth paragraph of 1-02.4(1), beginning with “Bid prices shall reflect”, and <br />substitute the following: <br />Bid prices shall include everything necessary for the completion of the Work <br />including, but not limited to, providing the materials, equipment, tools, plant and <br />other facilities, and the management, superintendence, labor, and all necessary <br />testing services. <br />Revise the first sentence in the paragraph that begins with “Any prospective Bidder <br />desiring an explanation” to read as follows: <br />Any prospective Bidder desiring an explanation or interpretation of the Bid <br />Documents, shall request the explanation or interpretation in writing by close of <br />business three business days preceding the bid opening to allow a written reply to <br />reach all prospective Bidders before the submission of their Bids. <br />Supplement 1-02.4(1) by adding the following: <br />Bidder acknowledges that Bidder has not relied on representation or warranty of the <br />City not expressly included in the Contract Documents.
The URL can be used to link to this page
Your browser does not support the video tag.