My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 53 <br />9. WSDOT/APWA 2025 Standard Specifications for Road, Bridge, and Municipal <br />Construction, <br />10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br />Revise the seventh paragraph of 1.04.2 to read as follows: <br />In case of any ambiguity or dispute over interpreting the Contract, the Engineer’s <br />decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br />1-04.3 Reference Information <br />Revise 1-04.3 to read as follows: <br />Reference Information provided to the Contractor is not part of the Contract. The City of <br />Everett does not guarantee the accuracy of the Reference Information and is not <br />responsible for the content of the Reference Information in any manner. Any use of <br />Reference Information by the Contractor is done solely at the Contractor’s risk. <br />1-04.4 Changes <br />Delete 1-04.4 and substitute the following: <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(******) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br />Work as changed. Among others, these changes and alterations may include: <br />1. Deleting or omitting any part of the Work , Equipment or material to be <br />provided under this Contract, <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the <br />City, and <br />7. Ordering the Contractor to accelerate or Delay the Work. <br />If the Contractor and City do not agree upon scope of Work changed or adjustment to <br />the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br />the Contractor to implement City directed change by notice. The City shall not pay or <br />be responsible or liable for changes implemented by the Contractor without explicit <br />notice from the City to proceed. <br />1-04.4(2) Extra Work <br />(******) <br />At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br />(3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br />the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br />the Contractor to perform the Extra Work on a Force Account basis. <br />1-04.4(3) Change Orders <br />(******) <br />Changes to the Work may result in an increase or decrease in Contract Sum, as provided <br />in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made <br />as provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in