My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 55 <br />1-04.5 Notice by Contractor <br />(******) <br />1-04.5(1) When Notice Must Be Given <br />Whenever: <br />1. The Contractor disagrees with any requirement, direction, interpretation or <br />determination by the City or City’s Representative; <br />2. The Contractor disagrees with anything required in a change order, or the <br />Engineer’s Written Determination or decision for which the Contractor <br />believes it is entitled to an increase in the Contractor price or time; <br />3. The Contractor knows, or should with the reasonable exercise of ordinary <br />care know, of a differing site condition as provided in 1-04.7 DIFFERING <br />SITE CONDITIONS (CHANGED CONDITIONS); <br />4. The Contractor knows, or should with the reasonable exercise of ordinary <br />care know, of a Delay or an event that may cause a Delay; <br />5. The Contractor believes, or with the reasonable exercise of ordinary care <br />should believe, it is entitled to an adjustment of Contract Sum or Time, even if <br />the total or exact amount or impact cannot yet be determined; <br />6. The Contractor believes it is required or directed to perform work that is <br />outside the scope of the Contract Documents; or <br />7. An event occurs, or fails to occur, that the Contractor believes, or should <br />reasonably foresee, may result in a Contract Claim; or <br />8. The actual quantities of Unit Price Work vary sufficiently from the original <br />estimate that Contractor may be entitled to an equitable adjustment of <br />Contract Sum as provided in 1-04.6 VARIATION IN INCREASED OR <br />DECREASED QUANTITIES; <br />The Contractor shall immediately give Notice to the City or City’s Representative as <br />provided in this section and elsewhere in the Contract Documents and Specifications. <br />Timely and adequate Notice is a condition precedent to a Contract Claim. <br />Requests for extensions of Contract Time shall be made and evaluated in accordance <br />with 1-08.3 PROGRESS SCHEDULE and 1-08.8 EXTENSIONS OF TIME. <br />Irrespective of any request for additional compensation or Contract Time or a Contract <br />Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br />proceed expeditiously and promptly with the Work as the City orders. <br />If the Contractor fails to follow the procedures of this Contract, including failing to give <br />Notice, the Contractor completely waives any Contract Claims. In its sole discretion, the <br />City may waive strict compliance with procedures, but any such waiver of one or more <br />items or elements does not waive the necessity for Contractor’s strict compliance with <br />any other item or element, nor shall such waiver be admissible in any legal proceeding <br />for any reason. <br />1-04.5(2) Form of Notice <br />The Notice shall be in writing and include the following minimum information: <br />1. A complete and accurate description of the event(s) giving rise to the Notice, <br />including dates, times, and locations; <br />2. A preliminary list of persons involved in such event; <br />3. A statement whether the Contractor believes the event may result in a <br />Contract Claim for additional Contract Time or adjustment of the Contract <br />Sum;
The URL can be used to link to this page
Your browser does not support the video tag.