My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 58 <br />1. The Contractor believes there is information missing from the Contract Documents <br />(Missing Information). <br />2. The Contractor believes a clarification of one or more of the Contract requirements is <br />necessary (Clarification). <br />3. The Contractor needs to repair or otherwise correct a deficiency in the Work that <br />requires a Change to the Contract to be acceptable (RFC – Construction Deficiency/ <br />Repair procedure). Requests submitted for this reason shall be submitted in <br />accordance with Section 1-05.7(1). <br />4. The Contractor needs to substitute a material that provides an equal or better level of <br />performance as the one specified in the Contract (RFC – Material Substitution). <br />Requests shall indicate the location(s), quantity, and shall describe how the material <br />provides an equal or better level of performance as the material originally specified. <br />5. The Contractor may submit a RFI that requests a change to the Contract requirements <br />for a reason other than one listed in items 1-4 of this section (RFC – Other). To be <br />considered, the request must not meet the requirements of a Value Engineering <br />Change Proposal. To be considered, the request shall describe how the change is <br />beneficial to the project <br /> <br />Unless otherwise determined by the City in writing, the Engineer will respond, in writing, to <br />RFIs within 14 calendar days in the order they are received. If the Engineer cannot respond <br />within 14 calendar days due to the nature and complexity of the RFI, the Engineer will <br />respond to the RFI stating how many additional days are needed for a full response. This <br />does not relieve the Contractor of its responsibility to request a time extension in accordance <br />with Section 1-08.8. If the Contractor needs to prioritize a RFI it shall indicate so as part of <br />the RFI. Oral explanations, interpretations, or instructions given by anyone other than the <br />Engineer will not be binding on the Contracting Agency. A response to a RFI shall be <br />considered a Written Determination. <br />If the Contractor’s Request for Information requires a change order, the Engineer’s response <br />will indicate whether they are authorizing the Contractor to proceed with the changed work <br />prior to an executed change order. Without this authorization, the Contractor shall not <br />proceed with the changed work until a Change Order has been processed. If the Contractor <br />believes the response requires a change order and the Engineer does not specifically state <br />that a change order is necessary, the Contractor shall submit its Notice in accordance with <br />Section 1-04.5. Proceeding without Notice shall waive the Contractor’s rights to Claim. <br />The Contractor shall bear all risk and all costs of any Work delays caused by rejection or <br />non-approval of any RFI that Requests a Change (RFC). The Contractor agrees the <br />Engineer is under no obligation to accept an RFC. The Engineer’s decision to accept or reject <br />all or part of a RFI that requests a change is final and not subject to protest. <br />Unit Bid prices shall cover all costs of submitting RFIs. <br />1-05.2 Authority of Assistants and Inspectors <br />Delete 1-05.2 and substitute the following: <br />1-05.2 City’s Representative <br />(******) <br />The City’s Representative shall be satisfied that all the Work is being done in accordance <br />with the requirements of the Contract. The Contract and Specifications give the City’s <br />Representative authority over the Work. Whenever it is so provided in this Contract, the <br />decision of the City’s Representative shall be final.
The URL can be used to link to this page
Your browser does not support the video tag.