My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2026
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 4:08:47 PM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Faber Construction 4/14/2026 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 63 <br />To facilitate the establishment of these lines and elevations, the City will provide the <br />Contractor with the following survey control: <br />ROADWAY, SURFACING AND PAVING <br />Establish elevation bench marks and center or base line alignment control <br />points for the mainline, one time only. Provide right of way stakes where <br />applicable. <br />Provide rights-of-way, easements or right-of-entry. <br />Provide the Contractor with technical advice if requested. <br />Computed grades where needed. <br />Provide horizontal and vertical curve data. <br />One copy of transit notes showing reference to horizontal and vertical control <br />points. <br />OTHER STRUCTURES <br />Centerline or offset coordinates to centerline of the structure. <br />A sufficient number of bench marks for levels to enable the Contractor to set <br />grades at reasonably short distances. <br />Monuments and control points as shown on the Plans. <br />The Contractor shall give the City three weeks notification to allow adequate <br />time to provide the above data. <br />The Contractor shall ensure a surveying accuracy within the following tolerances: <br />1. Slope stakes ±0.1 foot <br />2. Subgrade blue tops ±0.01 foot <br />3. Stationing ±0.01 foot <br />4. Alignment ±0.01 foot <br />5. Surfacing red & yellow tops ±0.01 foot <br />6. Superstructure elevations ±0.01 foot (from plan elevations) <br />7. Substructure ±0.02 foot (from plan elevations) <br />The Contractor shall slope stake the roadway before any construction may proceed. <br />Slope stakes shall be set at 50' maximum intervals on tangents and 25’ on curves. <br />Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br />tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br />The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br />Contractor shall keep updated survey field notes in a standard field book and in a format <br />set by the Engineer. These field notes shall include all survey work performed by the <br />Contractor's surveyor in establishing line, grade and slopes for the construction work. <br />Copies of these field notes shall be provided to the Engineer upon request and upon <br />completion of the Contract Work; the field book shall be submitted to the Engineer and <br />become property of the City. <br />If the survey work provided by the Contractor does not meet the standards of the <br />Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br />individual or individuals doing the survey work and the survey work will be completed by <br />the Engineer at the Contractor's expense. Costs for completing the survey work required <br />by the Engineer will be deducted from monies due or to become due the Contractor. <br />The City may spot-check the Contractor's surveying. These spot-checks will not change <br />the requirements for normal checking and testing as described elsewhere, and do not <br />relieve the Contractor of the responsibility of producing a finished product that is in <br />accordance with the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.