Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 63 <br />To facilitate the establishment of these lines and elevations, the City will provide the <br />Contractor with the following survey control: <br />ROADWAY, SURFACING AND PAVING <br />Establish elevation bench marks and center or base line alignment control <br />points for the mainline, one time only. Provide right of way stakes where <br />applicable. <br />Provide rights-of-way, easements or right-of-entry. <br />Provide the Contractor with technical advice if requested. <br />Computed grades where needed. <br />Provide horizontal and vertical curve data. <br />One copy of transit notes showing reference to horizontal and vertical control <br />points. <br />OTHER STRUCTURES <br />Centerline or offset coordinates to centerline of the structure. <br />A sufficient number of bench marks for levels to enable the Contractor to set <br />grades at reasonably short distances. <br />Monuments and control points as shown on the Plans. <br />The Contractor shall give the City three weeks notification to allow adequate <br />time to provide the above data. <br />The Contractor shall ensure a surveying accuracy within the following tolerances: <br />1. Slope stakes ±0.1 foot <br />2. Subgrade blue tops ±0.01 foot <br />3. Stationing ±0.01 foot <br />4. Alignment ±0.01 foot <br />5. Surfacing red & yellow tops ±0.01 foot <br />6. Superstructure elevations ±0.01 foot (from plan elevations) <br />7. Substructure ±0.02 foot (from plan elevations) <br />The Contractor shall slope stake the roadway before any construction may proceed. <br />Slope stakes shall be set at 50' maximum intervals on tangents and 25’ on curves. <br />Subgrade bluetops and surfacing red and yellow tops shall be set at 50' intervals in <br />tangent sections, 25' intervals in curve sections, and 10' intervals in intersection radii. <br />The Contractor's surveyor shall be a licensed surveyor in the State of Washington. The <br />Contractor shall keep updated survey field notes in a standard field book and in a format <br />set by the Engineer. These field notes shall include all survey work performed by the <br />Contractor's surveyor in establishing line, grade and slopes for the construction work. <br />Copies of these field notes shall be provided to the Engineer upon request and upon <br />completion of the Contract Work; the field book shall be submitted to the Engineer and <br />become property of the City. <br />If the survey work provided by the Contractor does not meet the standards of the <br />Engineer, then the Contractor shall, upon the Engineer's written request, remove the <br />individual or individuals doing the survey work and the survey work will be completed by <br />the Engineer at the Contractor's expense. Costs for completing the survey work required <br />by the Engineer will be deducted from monies due or to become due the Contractor. <br />The City may spot-check the Contractor's surveying. These spot-checks will not change <br />the requirements for normal checking and testing as described elsewhere, and do not <br />relieve the Contractor of the responsibility of producing a finished product that is in <br />accordance with the Contract.