Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 66 <br />14 calendar days after giving of such notice to the Contractor, the Contractor has failed <br />to make or undertake the repairs with due diligence. In case of an emergency where, in <br />the opinion of the City, delay could cause serious loss or damage, repairs may be made <br />prior to or concurrent with notice being sent to the Contractor. All costs and expenses <br />incurred by the City in connection with repair or replacement of Contractor’s Work under <br />this Section, including but not limited to the cost of materials, Equipment, other <br />contractor costs, additional staff costs (including overtime), inspection, design and <br />construction management service costs shall be fully reimbursed to the City by the <br />Contractor. <br />"Acceptance of the Work" shall not extinguish any covenant or agreement on the part of <br />the Contractor to be performed or fulfilled under this Contract that has not, in fact, been <br />performed or fulfilled at the time of such acceptance. All covenants and agreements <br />shall continue to be binding on the Contractor until they have been fulfilled. <br />The City and the Contractor agree that the guarantee on the completed portions of the <br />Work possessed and used by the City shall commence as to those portions on the date <br />that the City takes possession of those portions and so notifies the Contractor in writing. <br />City and Contractor further agree that such taking possession and use shall not be <br />deemed as acceptance of the Work. Takeover of completed portions of the Work shall <br />be at the City's option and will not be made until the Work can be put into routine service <br />on a permanent basis. <br />The guarantee provided herein shall be in addition to those specific guarantee or <br />warranty requirements for particular Equipment or Work items, or both, as indicated in <br />the Specifications and Special Provisions. <br />1-05.11 Final Inspection <br />Delete 1-05.11 and substitute the following: <br />1-05.11 Final Inspections and Operational Testing <br />(******) <br />1-05.11(1) Substantial Completion Date <br />When the Contractor considers the Work to be substantially complete, the Contractor <br />shall so notify the Engineer and request the Engineer establish the Substantial <br />Completion Date. The Contractor’s request shall list the specific items of Work that <br />remain to be completed in order to reach physical completion. The Engineer will <br />schedule an inspection of the Work with the Contractor to determine the status of <br />completion. The Engineer may also establish the Substantial Completion Date <br />unilaterally. <br />If, after this inspection, the Engineer concurs with the Contractor that the Work is <br />substantially complete and ready for its intended use, the Engineer, by written notice to <br />the Contractor, will set the Substantial Completion Date. If, after this inspection the <br />Engineer does not consider the Work substantially complete and ready for its intended <br />use, the Engineer will, by written notice, so notify the Contractor giving the reasons <br />therefor. <br />Upon receipt of written notice concurring in or denying substantial completion, whichever <br />is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized <br />interruption, the Work necessary to reach Substantial and Physical Completion. The <br />Contractor shall provide the Engineer with a revised schedule indicating when the <br />Contractor expects to reach substantial and physical completion of the Work. <br />The above process shall be repeated until the Engineer establishes the Substantial <br />Completion Date and the Contractor considers the Work physically complete and ready <br />for final inspection.