Laserfiche WebLink
3605 C STREET <br /> BC INVESTIGATIVE AUBURN, WA.98002 Project No: _23021 Sheet_2 of_6 <br /> ENGINEERS LLC WWW.BCIE.NET Designer _JB Date _01-19 24 <br /> 2538335557(0) Checked By Date <br /> 253.833.7309(F) Revisions Date <br /> RESPONSIVE • ACCURATE • THOROUGH 1.888.335.5557(T) <br /> GENERAL STRUCTURAL NOTES: <br /> 7.3 MINIMUM NAILING-PER 2018 IBC TABLE 2304.10.1 8.0 THROUGH 14.0 NOT USED <br /> 7.4 NOT USED 15.0 MECHANICAL/POWDER DRIVEN FASTENERS(NOT REQUIRED) <br /> 7.5 PLYWOOD/OSB SHEATHING 16.0 SPECIAL INSPECTIONS(NOT REQUIRED) <br /> EACH SHEET SHALL BEAR THE TRADEMARK OF THE AMERICAN 17.0 MISCELLANEOUS <br /> PLYWOOD ASSOCIATION. ALL GRADING AND INSTALLATION SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO PROCEEDING.PROVIDE ERECTION BRACING AS <br /> CONFORM TO MOST CURRENT VERSION OF PS2 FOR OSB. USE NECESSARY UNTIL PERMANENT SUPPORT AND STIFFNESS ARE INSTALLED. REFER TO ARCHITECTURAL <br /> THICKNESS AND NAILING AS SHOWN ON THE DRAWINGS.SHEATHING PLANS FOR WALL OPENING,ARCHITECTURAL TREATMENT AND DIMENSIONS NOT SHOWN. REFER TO <br /> SHALL HAVE EXPOSURE RATING AS APPROPRIATE PER THE MECHANICAL AND ELECTRICAL PLANS FOR SIZE AND LOCATION OF ALL OPENINGS FOR DUCTS, <br /> CONTRACTOR'S CONSTRUCTION AND WEATHER CONDITIONS SPECIFIED PIPES,CONDUITS,ETC.,NOT SHOWN. <br /> BY CONTRACTOR. EXCEPT AS OTHERWISE SHOWN OR NOTED,PROVIDE <br /> 8d AT 6"ON CENTER @ SUPPORTED PANEL EDGES AND 8d AT 12"ON 18.0 ABBREVIATIONS <br /> CENTER ON OTHER SUPPORTING MEMBERS FOR WALLS AND ROOFS. -. DIAMETER I/F INSIDE FACE PWD PLYWOOD <br /> FOR FLOORS,USE THE SAME SPACING PATTERN AS STATED FOR WALLS ADD'L ADDITIONAL INT INTERIOR RQD REQUIRED <br /> OR ROOF EXCEPT USE 10d NAILS. BLKG BLOCKING JT(s) JOINT(s) SIM SIMILAR <br /> BOT BOTTOM MIN MINIMUM SHTG SHEATHING <br /> NOTE:EQUIVALENT RATED PLYWOOD MAY BE USED IN LIEU OF OSB CTV CONTRACTOR TO VERIFY(N) NEW T&B TOP&BOTTOM <br /> CALLED OUT.ALL THICKNESS AND GRADING SHALL CONFORM TO PS1 DTL DETAIL O.C. ON CENTER TYP TYPICAL <br /> OR PS2.SHEATHING SHALL HAVE EXPOSURE RATING AS APPROPRIATE (E) EXISTING OSB ORIENTED STRAND BOARD <br /> PER THE CONTRACTOR'S CONSTRUCTION AND WEATHER CONDITIONS EA EACH 0./F OUTSIDE FACE <br /> SPECIFIED BY CONTRACTOR. EXT EXTERIOR PNL PANEL <br /> INFO INFORMATION P-NAIL(s) PNEUMATIC NAILS <br /> ROOF DIAPHRAGM:15/32" PWD(PANEL INDEX=24/16);WITH 8d <br /> NAILS OR.131"DIA P-NAILS AT 6"O.C.AT SUPPORTED PANEL EDGES 19.0 SCOPE OF WORK <br /> AND AT 12"O.C.AT FIELD TYPICAL UNLESS NOTED OTHERWISE ON 1. THE APPROVED PLANS COMPLETED BY WOODWAY HOMES,B2309-040,INDICATED THE <br /> PLAN. WHERE REQUIRED,USE PLY-CLIPS INSTALLED PER (E)KNEE WALLS ARE TO BE REFRAMED AT DIFFERENT LOCATIONS CLOSER TO THE(E) <br /> MANUFACTURER'S GUIDELINES AND APA GUIDELINES. EXT.WALLS. CITY REVIEW COMMENTS NOTED THAT"ENGINEERING IS REQUIRED". <br /> 7.6 MANUFACTURED TIMBER BEAMS(NONE) 2. THE BUILDING OFFICIAL,TONY LEE,HAS APPROVED THESE SKs BE SUBMITTED FOR THE <br /> "ENGINEERING REQUIRED"AND SUBMITTED TO MR.LEE VIA EMAIL <br /> 7.7 PRESERVATIVE TREATMENT <br /> 3. BCIE VERIFIED THE IMPACT TO THE(E)RAFTERS BY HAVING(N)KNEE WALLS CLOSER TO <br /> ALL EXPOSED FRAMING LUMBER,PLYWOOD AND DECK MATERIALS THE(E)EXT.WALLS,THE IMPACT TO THE(E)CEILING JOISTS BELOW,AND THE IMPACT <br /> SHALL BE PRESSURE TREATED WITH.25#/CF PENTACHLOROPHENOL TO THE(E)BEAM THAT IS ALONG THE CENTER OF THE MAIN FLOOR ABOVE THE <br /> PER AWPA SPECIFICATION P-5 OR OTHER APPROVED TREATMENT. BASEMENT&CRAWL SPACE. <br /> ALL CUTTING AND BORING AFTER PRESSURE TREATMENT SHALL BE <br /> CARED FOR IN ACCORDANCE WITH AWPA SPECIFICATION M-4. 4. OVERALL,THE DEAD AND LIVE LOADS HAVE NOT CHANGED SO A FOUNDATION <br /> CONTRACTOR SHALL VERIFY COMPATIBLITY BETWEEN THE PRESSURE ANALYSIS IS NOT REQ'D PER CODE. <br /> TREATMENT AND ANY HARDWARE OR FASTENERS IN CONTACT 5. THESE SKs ARE ENGINEERED&INCLUDE STRUCTURAL ANALYSIS. NO CALCULATIONS <br /> WITH THE PRESSURE TREATED MATERIAL(S). ARE PROVIDED. <br /> LEE 8 jN <br /> ,40 <br /> 4/44 <br /> SK-1 STRUCTURAL NOTES (2 OF 2) .4,,s,sloN <br /> �E��710 <br /> (2 OF 6) 11-19-24 <br /> CAUSE&ORIGIN•DUE DILIGENCE•RESTORATIONDESIGN•EXPERT WITNESS•ACCIDENT INVESTIGATION*SEISMIC HAZARD ASSESSMENT.STRUCTURAL CONSULTING <br /> FOR: GOLDEN COAST CONSTRUCTION TITLE: COLETTI FIRE BCIE JOB NO. <br /> &RESTORATION, 1201 MONSTER RD SW,STE 320 1617 COLBY AVE,EVERETT, WA 98201 23021 <br />