My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4328 CRESCENT AVE 2025-07-30
>
Address Records
>
CRESCENT AVE
>
4328
>
4328 CRESCENT AVE 2025-07-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 9:52:21 AM
Creation date
4/23/2025 3:53:39 PM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4328
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 Washington State Energy Code — Residential <br />Prescriptive Energy Code Compliance for All Climate Zones in Washington <br />Single Family — New & Additions (effective February 1, 2021) <br />Table 406.3 — Energy Credits (Single Family) <br />' Option ....---------- __...._..- --- --- <br />P _ _ _ _Description Credits•SF <br />2. AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION OPTIONS' <br />--nly one option from Items 2.1 through 2.4 may be selected in this category. <br />OCompliance based on R402.4.1.2: Reduce the tested air leakage to 3.0 air changes per hour <br />maximum at 50 Pascals or <br />For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested ! j <br />:air leakage to 0.3 cfm/sf maximum at 50 Pascals and <br />All whole house ventilation requirements as determined by Section M1507.3 of the <br />International Residential Code or Section 403.8 of the International Mechanical Code shall <br />2.1 'be met with a high efficiency fan(s) (maximum 0.35 watts/cfm), not interlocked with the 05 j <br />.furnace fan (if present). Ventilation systems using a furnace including an ECM motor are <br />allowed, provided that they are controlled to operate at low speed in ventilation only ' <br />mode. <br />To qualify to claim this credit, the building permit drawings shall specify the option being <br />selected and the maximum tested building air leakage, and shall show the qualifying <br />'ventilation system and its control sequence of operation. <br />Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes <br />per hour maximum at 50 Pascals or <br />'For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested <br />2.2 air leakage to 0.25 cfm/sf maximum at 50 Pascals and 1.0 <br />All whole house ventilation requirements as determined by Section M1507.3 of the <br />International Residential Code or Section 403.8 of the International Mechanical Code shag <br />be met with a heat recovery ventilation system with minimum sensible heat recovery <br />efficiency of 0.65.1 <br />—... ........ _... <br />Compliance based on Section R402.4.1.2: <br />Reduce the tested air leakage to 1.5 air changes per hour maximum at 50 Pascals or <br />For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested <br />2.3 air leakage to 0.25 cfm/sf maximum at 50 Pascals and <br />1.5 <br />All whole house ventilation requirements as determined by Section M1507.3 of the <br />International Residential Code or Section 403.8 of the International Mechanical Code shall <br />be met with a heat recovery ventilation system with minimum sensible heat recovery <br />efficiency of 0.75.1 <br />Compliance based on Section R402.4.1.2: <br />Reduce the tested air leakage to 0.6 air changes per hour maximum at 50 Pascals or <br />For R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested <br />2.4 ;air leakage to 0.15 cfm/sf maximum at 50 Pascals and 2.0 <br />All whole house ventilation requirements as determined by Section M1507.3 of the <br />International Residential Code or Section 403.8 of the International Mechanical Code shall <br />be met with a heat recovery ventilation system with minimum sensible heat recovery <br />.efficiency of 0.80. Duct installation shall comply with Section R403.3.7. 1 <br />:i To qualify to claim this credit, the building permit drawings shall specify the option being selected and shall <br />specify the maximum tested building air leakage and shall show the heat recovery ventilation system. <br />Prescriptive Path —Single Family 2018 Washington State Energy Code-R <br />
The URL can be used to link to this page
Your browser does not support the video tag.