Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />6/11/2024 <br />6/11/2024 <br />BLDG 03- <br />Matt Schreifels <br />APPROVAL <br />eTRAKiT Inspection Request <br />FOUNDATION WALL <br />Notes: <br />6/6/2024 10:09 AM GPA ENTERPRISES INC <br />Contact Name: GPA ENTERPRISES INC <br />Site Address: 4328 CRESCENT AVE <br />Phone:4255082465 <br />e-Mail: PAVELGPA@GMAIL.COM <br />BLDG 06- <br />6/26/2024 <br />6/26/2024 <br />UNDERSLAB <br />Matt Schreifels <br />APPROVAL <br />eTRAKiT Inspection Request <br />INSULATION <br />Notes: <br />6/22/2024 12:00 PM GPA ENTERPRISES INC <br />Contact Name: GPA ENTERPRISES INC <br />Site Address: 4328 CRESCENT AVE <br />Phone:4255082465 <br />e-Mail: PAVELGPA@GMAIL.COM <br />8/1/2024 <br />8/1/2024 <br />BLDG 07-EXTERIOR <br />Matt Schreifels <br />CORRECTION <br />See Notes <br />SHEAR <br />REQUIRED <br />Notes: <br />7/30/2024 4:29 AM GPA ENTERPRISES INC <br />Contact Name: GPA ENTERPRISES INC <br />Site Address: 4328 CRESCENT AVE <br />Phone:4255082465 <br />e-Mail: PAVELGPA@GMAIL.COM <br />Special inspection required. Double 2x or 3x blocking required at SW3. Missing A35 at gable end and at floor cantilever. Need engineer approval for <br />replacement of H1 for screws into the truss. <br />8/6/2024 <br />8/6/2024 <br />BLDG 07-EXTERIOR <br />I Matt Schreifels <br />APPROVAL <br />see notes <br />SHEAR <br />Notes: <br />8/4/2024 5:38 PM GPA ENTERPRISES INC <br />Contact Name: GPA ENTERPRISES INC <br />Site Address: 4328 CRESCENT AVE <br />Phone:4255082465 <br />e-Mail: PAVELGPA@GMAIL.COM <br />Corrections have been addressed, and special inspection report has been provided <br />8/26/2024 <br />F8/26/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />CORRECTION <br />See Notes <br />REQUIRED <br />Notes: <br />1. Receive rough -in approval for all Sub -permits prior to scheduling for framing inspection. <br />1. Add clips at Gable end bracing to top plate as well as A34s at ladder framing to truss per approved plan detail. <br />Reschedule for framing inspection once corrections have been addressed. <br />I <br />Printed: Wednesday, 04 December, 2024 2 of 4 rk <br />SUPERION <br />