My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4400 CRESCENT AVE 2025-08-21
>
Address Records
>
CRESCENT AVE
>
4400
>
4400 CRESCENT AVE 2025-08-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 8:53:49 AM
Creation date
4/24/2025 9:21:55 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4400
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2408-008 <br />Applied: 8/4/2024 <br />Issued: 8/9/2024 <br />Status: FINALED <br />Parent Permit: B2403-141 <br />Parent Project: <br />Details: <br />Rough In and Trim <br />Permit Inspections <br />City of Everett <br />Approved:8/5/2024 <br />Finaled: 1/2/2025 <br />Description: Ground work plumbing before slab. Rough in plumbing <br />Site Address: 4400 CRESCENT AVE <br />City, State Zip Code: EVERETT, WA 98203 <br />Applicant: GPA ENTERPRISES INC <br />Owner: GPA ENTERPRISES INC <br />Contractor: KED DEVELOPMENT LLC (PLBG) <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />PLUMB 02- <br />8/12/2024 <br />8/12/2024 GROUND <br />JASON <br />APPROVAL <br />see notes <br />WORK/SLAB <br />MORRISSEY <br />Notes: <br />Pavel Andreyanov <br />(425)5082465 <br />- Under slab DWV. <br />9/16/2024 <br />9/16/2024 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />see notes <br />IN <br />MORRISSEY <br />Notes: <br />9/12/2024 4:49 PM Pavel Andreyanov <br />Contact Name: Pavel Andreyanov <br />Site Address: PO Box 1395 <br />Phone:4255082465 <br />e-Mail: pavelgpa@gmail.com <br />- Rough DWV and water piping. <br />12/26/2024 <br />12/26/2024 <br />PLUMB 08-FINAL** <br />JEFF M RHODE <br />CORRECTION <br />see notes <br />REQUIRED <br />Notes: <br />-finish installation of upper share bathroom lav-seal toilets to floor upc 402.2 <br />12/30/2024 <br />12/30/2024 <br />PLUMB 08-FINAL** <br />I JEFF M RHODE <br />CANCELLED <br />see notes <br />Notes: <br />-Pavel called Rakeeb stating plumbing final is not ready for inspection today <br />I <br />Printed: Thursday, 24 April, 2025 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.