Laserfiche WebLink
Mr.Yin Lu <br /> October 13,2023 <br /> Page 2 <br /> b. The truss construction and calculations should bear the seal and signature of the engineer <br /> performing the design. <br /> i. Note included in supplemental sheet S01, deferred submittals sectionv <br /> c. The truss design should be reviewed for conformance with the approved construction <br /> drawings and referenced building codes, and approved for construction by the designer- <br /> of-record for the approved drawings,prior to fabrication and erection. <br /> i. Note included in supplemental sheet S01, deferred submittals section <br /> 8. It appears that the exterior walls will require bracing where the wall framing is not continuous <br /> from the foundation to the roof sheathing.Details for the bracing should be submitted for review. <br /> a. Bracing detail added. <br /> Please feel free to contact me if you would like to discuss any of these items in more detail or if you <br /> have any questions. You can reach me by phone at(206) 914-9536,or by email at <br /> LakeviewSE@outlook.com. <br /> Sincerely, <br /> 1 gSHALL Hof wASyf c g� <br /> tt, <br /> Jon Conner,PE, SE r• 16. lir-%" <br /> Lakeview Structural Engineering <br /> 44672 Ff' �V <br /> C3i"" eit1I L V4G‘Gt� <br /> 8ION AL <br /> 10/13/23 5:20 PM <br />