Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/21/2024 3/21/2024 BLDG 13-CEILING RAKEEB KHAN PARTIAL <br /> GRID APPROVAL <br /> Notes: <br /> Level 2 and 3 corridors and elevator lobby. <br /> 5/15/2024 F5/15/2024 BLDG 13-CEILING RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> GRID <br /> Notes: <br /> 5/14/2024 10:28 AM Shea Tonkin <br /> 3rd Floor cover only <br /> Contact Name:Josh Starkenburg <br /> Site Address:1000 SE EVERETT MALL WAY FLOOR 2&3 <br /> Phone:2064233195 <br /> e-Mail:sheat@skylineconstruction.build <br /> 3rd floor ok.Bathrooms on 2nd and 3rd floor ok. <br /> 5/28/2024 5/29/2024 TEMP CERTIFICATE Matt Schreifels APPROVAL 30 day T.C.O.(Restrooms) <br /> OF OCCUPANCY <br /> Notes: <br /> 5/24/2024 1:05 PM Shea Tonkin <br /> Contact Name:Josh Starkenburg <br /> Site Address:1000 SE EVERETT MALL WAY FLOOR 2&3 <br /> Phone:2064233195 <br /> e-Mail:sheat@skylineconstruction.build <br /> Pulled forward per contractors request from 6/3/24 to 5/28/24. <br /> 2nd&3rd floor restrooms only,approved for 30 day Temp Cert.of Occupancy <br /> Temporary restroom partitions installed. <br /> Must Re-Inspect restrooms prior to permit final approval. <br /> 8/20/2024 8/20/2024 BLDG 16-FINAL Matt Schreifels APPRVD-PERMIT FINALeTRAKiT Inspection Request <br /> Notes: <br /> 8/15/2024 5:55 AM Shea Tonkin <br /> Contact Name:Shea Tonkin <br /> Site Address:1000 SE Everett mall way <br /> Phone:2065108722 <br /> e-Mail:sheat@skylineconstruction.build <br /> 8/21/2024 CERTIFICATE OF permit Technician <br /> OCCUPANCY <br /> Notes: <br /> I <br /> Printed:Wednesday, 21 August, 2024 2 of 2 rk <br /> SUPERION <br />