Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />FIRE 01- <br />7/21/2023 <br />7/21/2023 <br />CONSTRUCTION <br />MICHAEL WISLER <br />OTHER <br />See notes. <br />SAFETY INSPECTION <br />Notes: <br />7/20/2023 11:54 AM Michael Feldmann <br />There was not a spot for Fire Consult I have a question about TCO for USFS. This could be accomplished over the phone. Thanks <br />Contact Name: Michael Feldmann <br />Site Address: 1000 SE EVERETT MALL WAY #110 & 410 <br />Phone:2065030112 <br />e-Mail: mfeldmann@farwestti.com <br />Michael Feldman and I discussed TCO for this building. I stated that as long as all Fire and Life Safety systems, including FA and Fire Doors/Stops are <br />operating, that TCO would be signed off. <br />8/11/2023 <br />8/11/2023 <br />BLDG 13-CEILING <br />Matt Schreifels <br />NOT READY <br />eTRAKiT Inspection Request <br />GRID <br />Notes: <br />8/9/2023 11:43 AM Michael Feldmann <br />Contact Name: Michael Feldmann <br />Site Address: 1000 SE EVERETT MALL WAY #110 & 410 <br />Phone:2065030112 <br />e-Mail: mfeldmann@farwestti.com <br />8/16/2023 <br />8/16/2023 <br />BLDG 13-CEILING <br />Matt Schreifels <br />CORRECTION <br />eTRAKiT Inspection Request <br />GRID <br />REQUIRED <br />Notes: <br />8/15/2023 12:59 PM Michael Feldmann <br />Contact Name: Michael Feldmann <br />Site Address: 1000 SE EVERETT MALL WAY #110 & 410 <br />Phone:2065030112 <br />e-Mail: mfeldmann@farwestti.com <br />sub -permits (electrical & mechanical) approval for work above ceiling grid prior to ceiling grad inspection & add seismic supports in office space on 1st <br />floor that is over 1000 soft. <br />8/18/2023 <br />8/18/2023 <br />BLDG 13-CEILING <br />Matt Schreifels <br />APPROVAL <br />eTRAKiT Inspection Request <br />GRID <br />Notes: <br />8/16/2023 12:39 PM Michael Feldmann <br />Contact Name: Michael Feldmann <br />Site Address: 1000 SE EVERETT MALL WAY #110 & 410 <br />Phone:2065030112 <br />e-Mail: mfeldmann@farwestti.com <br />Corrections made to seismic bracing on first floor office space. Mechanical has outstanding items to inspect above the ceiling grid. If tiles are installed <br />some will be required to be removed by contractor and/or sub -contractor to provide access to areas that still require inspections. <br />I <br />Printed: Monday, 19 August, 2024 3 of 5 rk <br />SUPERION <br />