My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 10:21:15 AM
Creation date
4/24/2025 11:17:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL OBSERVATION REPORT <br />Report Number: M7241O69.00O6 <br />Service Date: 04/08/24 <br />Report Date: 04/08/24 <br />Client <br />Pietromonaco Jackson Properties LLC <br />Attn: Kyle Kauzlarich <br />7525 SE 24th St Ste 300 <br />Mercer Island, WA 98040 <br />Permit No: B2311-023 <br />General Information <br />■ rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Office -Exterior Upgrades <br />1000 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7241O69 <br />Josh Starkenburg with Skyline requested Terracon to be on site for steel substrate inspection at the above referenced project. Observed work was <br />being performed by Norkote. The results of observation(s) for today were reported to Josh Starkenburg with Skyline. <br />The construction documents referenced for this inspection include: Fireproofing shop drawings. <br />Summary of Services <br />Inspected the steel substrate prior to application of spray applied fireproofing noted that the existing steel has been scraped to remove loose <br />material and metal lath has been applied. Norkote forman stated that they are going to use a bonding agent on the steel as well prior to applying <br />the spray applied fireproofing. Weather protection was placed and temperature at the time of inspection was 43 degrees. Norkote was aware of <br />the 40 degree minimum and stated that a heater was going to be placed in the enclosure after spraying to heat overnight. <br />Compliance Statement <br />Based on our observations, construction activities at the above referenced locations appeared to be completed in general accordance with the <br />project plans and specifications. <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Michael Mattox <br />Reported To: Josh Starkenburg with Skyline <br />Contractor: Norkote <br />Report Distribution: <br />(1) Pietromonaco Jackson Properties (1) Mayes Testing Engineers, Inc, Gale <br />LLC, Kyle Kauzlarich Noyes <br />(1) Mayes Testing Engineers, Inc, Mike (1) Skyline Construction Inc, Jakob Reviewed By: <br />Ma f.,.. <br />(1) Skyline Construction Inc, Josh <br />Eaton Michael Mattox <br />Group Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />DMO10, 04-29-22 Rev.3 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.