My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 10:21:15 AM
Creation date
4/24/2025 11:17:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIREPROOFING THICKNESS REPORT <br />Report Number: M7241069.0007 <br />Service Date: 04/12/24 <br />Report Date: 04/12/24 <br />Client <br />Pietromonaco Jackson Properties LLC <br />Attn: Kyle Kauzlarich <br />7525 SE 24th St Ste 300 <br />Mercer Island, WA 98040 <br />Permit No.: B2311-023 <br />GENERAL INFORMATION <br />■ rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Office -Exterior Upgrades <br />1000 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7241069 <br />The construction documents referenced for this inspection include: spray applied fireproofing submittal dated 4-4- <br />24 <br />SUMMARY OF SERVICES <br />Thickness testing. <br />SUMMARY OF TESTING <br />Reported to the site and met with the contractor. Obtained a copy of the spray applied fireproofing submittal with <br />the thickness drawings attached. Verified the applied thicknesses of the Cafco Blaze Shield HP spray applied <br />fireproofing on the structural steel elements for both the North canopy (2 new columns only) and South canopy <br />(columns and beams). The existing 2 columns at the North canopy were just patched as required and sprayed for <br />evenness. Found all thicknesses were within the specified thicknesses and allowed tolerances except for the <br />South Canopy W12X14 beams with the specified thickness of 2 7/16 inches. Please see the attached inspection <br />reports for additional details. <br />The results of observation(s) for today were reported to Josh with Skyline. <br />COMPLIANCE STATEMENT <br />Nonconforming Condition(s) <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br />the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CT0001, 10-16-13, Rev.10 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.