STRUCTURAL STEEL OBSERVATIONS REPORT <br />Report Number: M7241069.0004 <br />Service Date: 03/29/24 <br />Report Date: 03/29/24 <br />Client <br />Pietromonaco Jackson Properties LLC <br />Attn: Kyle Kauzlarich <br />7525 SE 24th St Ste 300 <br />Mercer Island, WA 98040 <br />Permit No: B2311-023 <br />General Information <br />Project <br />■ rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Everett Mall Office -Exterior Upgrades <br />1000 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7241069 <br />Josh Starkenburg with Skyline requested Terracon be on site for the following services: welding observation. Structural steel is being constructed <br />by CHG Building Systems. The results of observation(s) for today were reported to Josh Starkenburg with Skyline. <br />The construction documents referenced for this observation include: Structural plans dated 1/11/2024, 003 Bulletin EMOP II -Structural S-Canopy <br />plans dated 2/24/2024. <br />Welding Observation <br />Welding was performed prior to Terracon's arrival. Welding procedures could not be verified. Welder qualifications have been reviewed. <br />Inspection Elevation <br />Connection <br />Type of <br />Referenced <br />Applicable Compliance Status* <br />Type /Location <br />Type <br />Weld <br />Documents <br />Code <br />Initial (1) Canopy Roof <br />W-beam to W- <br />Bevel <br />2/S2.01, 2/ and <br />AWS D1.1 In Progress <br />Framing, North <br />column, CJP weld <br />Groove <br />7/S3.01 <br />Static <br />Canopy, B-line <br />fit -up <br />columns <br />Final (2) Canopy Roof <br />1/4"xY plate to <br />Fillet <br />4/S2.01 <br />AWS D1.1 Complies <br />Framing, South <br />W-beam top <br />Static <br />Canopy, J-K <br />flange <br />* See below for details <br />Additional Comments <br />Welding performed by Aaron Mitchell, WABO <br />ID No. W03788, exp. <br />7/1/2024. <br />Observation No. 1: observed weld fit -up and preparation for complete <br />joint penetration welds (CJP). <br />Compliance Statement <br />Based on our observations, structural steel <br />construction activities at the above -referenced locations appeared to be completed in general accordance <br />with the project plans and specifications. <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Carl Harrington <br />Reported To: Josh Starkenburg with Skyline <br />Contractor: CHG Building Systems <br />Report Distribution: <br />(1) Pietromonaco Jackson Properties (1) Mayes Testing Engineers, Inc, Gale <br />LLC, Kyle Kauzlarich Noyes <br />(1) Mayes Testing Engineers, Inc, Mike (1) Skyline Construction Inc, Jakob Reviewed By: <br />(1) Skyline Construction Inc, Josh <br />Eaton Michael Mattox <br />Group Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />DM027, 04-29-22 Rev.5 Page 1 of 1 <br />