My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 10:21:15 AM
Creation date
4/24/2025 11:17:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NDE: ULTRASONIC TESTING INSPECTION REPORT <br />Report Number: M7241069.0003 <br />Service Date: 02/23/24 <br />Report Date: 02/24/24 <br />Client <br />Pietromonaco Jackson Properties LLC <br />Attn: Kyle Kauzlarich <br />7525 SE 24th St Ste 300 <br />Mercer Island, WA 98040 <br />General Information <br />■ rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Office -Exterior Upgrades <br />1000 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7241069 <br />Custom Steel requested Terracon be on site for ultrasonic testing. Structural steel is being constructed by Custom Steel. The results of <br />observation(s) for today were reported to Custom Steel. <br />The construction documents referenced for this observation include: Shop Dwg's 12-15-23. <br />Ultrasonic Testing Information <br />Instrument <br />UT Equipment-65776 <br />Amplitude <br />Calibration <br />Expiration Date <br />2024-02-29 <br />Surface Surface Transducer(s) Used <br />Cleanliness Preparation <br />Clean As Welded 701, 0.625-inch, 2.25 mHz <br />Terracon Procedure No. <br />TC-AW S-UT4 <br />Calibration Block <br />IIW 2 <br />Acceptance Criteria <br />D1.1-15 Table 6.1/6.2 <br />Couplant Index Point <br />Verification <br />Glycerin Yes <br />Compliance Statement <br />Based on our observations, structural steel construction activities at the above -referenced locations appeared to be completed in general <br />accordance with the project plans and specifications. <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Nicholas Leede <br />Reported To: Custom Steel <br />Contractor: Custom Steel <br />Report Distribution: <br />(1) Pietromonaco Jackson Properties (1) Mayes Testing Engineers, Inc, Gale <br />LLC, Kyle Kauzlarich Noyes <br />(1) Mayes Testing Engineers, Inc, Mike (1) Skyline Construction Inc, Jakob Reviewed By: <br />Ma f.,.. <br />(1) Skyline Construction Inc, Josh <br />Eaton Michael Mattox <br />Group Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />DM029, 04-29-22 Rev.2 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.