Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />3/21/2024 <br />3/21/2024 <br />BLDG 13-CEILING <br />RAKEEB KHAN <br />PARTIAL <br />GRID <br />APPROVAL <br />Notes: <br />Level 2 and 3 corridors and elevator lobby. <br />5/15/2024 <br />5/15/2024 <br />BLDG 13-CEILING <br />RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />GRID <br />Notes: <br />5/14/2024 10:28 AM Shea Tonkin <br />3rd Floor cover only <br />Contact Name: Josh Starkenburg <br />Site Address: 1000 SE EVERETT MALL WAY FLOOR 2&3 <br />Phone:2064233195 <br />e-Mail: sheat@skylineconstruction.build <br />3rd floor ok. Bathrooms on 2nd and 3rd floor ok. <br />5/28/2024 <br />5/29/2024 <br />TEMP CERTIFICATE <br />Matt Schreifels <br />APPROVAL <br />30 day T.C.O.(Restrooms) <br />OF OCCUPANCY <br />Notes: <br />5/24/2024 1:05 PM Shea Tonkin <br />Contact Name: Josh Starkenburg <br />Site Address: 1000 SE EVERETT MALL WAY FLOOR 2&3 <br />Phone:2064233195 <br />e-Mail: sheat@skylineconstruction.build <br />Pulled forward per contractors request from 6/3/24 to 5/28/24. <br />2nd & 3rd floor restrooms only, approved for 30 day Temp Cert. of Occupancy <br />Temporary restroom partitions installed. <br />Must Re -Inspect restrooms prior to permit final approval. <br />8/20/2024 <br />8/20/2024 <br />BLDG 16-FINAL <br />Matt Schreifels <br />APPRVD-PERMIT <br />Inspection Request <br />FINALeTRAKiT <br />Notes: <br />8/15/2024 5:55 AM Shea Tonkin <br />Contact Name: Shea Tonkin <br />Site Address: 1000 SE Everett mall way <br />Phone:2065108722 <br />e-Mail: sheat@skylineconstruction.build <br />8/21/2024 <br />CERTIFICATE OF <br />permit Technician <br />OCCUPANCY <br />Notes: <br />I <br />Printed: Wednesday, 21 August, 2024 2 of 2 rk <br />SUPERION <br />