My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
>
Address Records
>
SE EVERETT MALL WAY
>
1000
>
BASE FILE
>
1000 SE EVERETT MALL WAY BASE FILE 2025-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 10:21:15 AM
Creation date
4/24/2025 11:17:34 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FABRICATION SHOP OBSERVATION REPORT <br />Report Number: M7241069.0001 <br />Service Date: 02/21/24 <br />Report Date: 02/21/24 <br />Client <br />Pietromonaco Jackson Properties LLC <br />Attn: Kyle Kauzlarich <br />7525 SE 24th St Ste 300 <br />Mercer Island, WA 98040 <br />Permit # B2311-123 <br />General Information <br />■ rerracon <br />20225 Cedar Valley Rd Ste 110 <br />Lynnwood, WA 98036-6365 <br />425-742-9360 <br />Project <br />Everett Mall Office -Exterior Upgrades <br />1000 SE Everett Mall Way <br />Everett, WA <br />Project Number: M7241069 <br />Custom Steel requested Terracon be at the Custom Steel shop located at 3530 Rainier Avenue South Seattle for the following services: steel <br />fabrication. The results of observation(s) for today were reported to Anh Phan. <br />The construction documents referenced for this observation include: C1 & C2 dated 12-15-23. <br />Fabrication Observation <br />Terracon provided shop fabrication observation due to jurisdictional requirements. <br />Terracon performed a review of the welder qualifications and welding procedures provided. No welding observation was performed today. See <br />below for a summary of the reviewed items. <br />Welder Qualification <br />Welder Name Welder ID <br />Anh Phan W02851 D <br />Additional Comments <br />Fit up of column plates acceptable. <br />Process/Procedure <br />Process Filler Metal Shielding/Flux <br />FCAW E71T-1 N/A <br />WPS No. <br />Cp-1 <br />Compliance Statement <br />Based on our observations, structural steel construction activities at the above -referenced locations appeared to be completed in general accordance <br />with the project plans and specifications. <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Mark Vassallo <br />Reported To: Anh Phan <br />Contractor: <br />Report Distribution: <br />(1) Pietromonaco Jackson Properties <br />(1) Mayes Testing Engineers, Inc, Gale <br />LLC, Kyle Kauzlarich <br />Noyes <br />(1) Mayes Testing Engineers, Inc, Mike <br />Ma f. <br />(1) Skyline Construction Inc, Jakob <br />u—H.r- <br />Reviewed By: D <br />(1) Skyline Construction Inc, Josh <br />Michael Mattox <br />Eaton <br />Group Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above <br />and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br />the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />DM006, 04-29-22 Rev.2 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.