Laserfiche WebLink
Honeywell Secondary Power Requirements <br /> HPFF8#2 Power Supply <br /> Protected Premises: EMOP II Date: 1/10/2019 <br /> Address: 1000 Everett Mall Way <br /> City: Everett State: WA Zip: 98208 <br /> Prepared By: Western States Fire Protection Phone: 425-881-0100 <br /> Address: 14690 NE 95th St#101 Email: seth.zehnderCcDwsfp.us <br /> City: Redmond State: WA Zip: 98052 <br /> Secondary Load Requirements 2.59 Amp Hours <br /> Total Secondary Load from the calculation table below. <br /> Current Draw Time (hours) Total (AH) <br /> Secondary Standby Load Required Standby Time <br /> 0.075 A x 24 hours 1.80 <br /> Secondary Alarm Load Required Alarm Time (hours) <br /> 4.265 A x 0.084 hours 0.36 <br /> Total Secondary Load 2.16 <br /> Derating factor x 1.2 <br /> Secondary Load Requirements 2.59 AH <br /> Battery Selection 12 Amp Hours <br /> Select batteries from the list below. <br /> 12 AH BAT-12120 Battery(12 volt) <br /> 8 Two ®Four (two 12VDC sets in parallel) <br /> Page 1 of 2 <br />