Laserfiche WebLink
_ Page 1 of 1 <br /> vqm- <br /> ..,: <br /> lm1 1&Associates, inC. Field <br /> Geotechnical Engineering.Environmental Engineering Report NO.:09623454DFR112823GMJG <br /> Construction Testing and Inspection <br /> DATE: 11/28/2023 Set Count: CONTRACTOR: Hughes Construction <br /> PROJECT#: 09623454 PERMIT#: B2304-60 <br /> PROJECT: Trader Joe's 139 INSPECTOR: G.Moe/J.Gelder <br /> LOCATION: 1302 SE Everett Mall Way JURISDICTION: City of Everett <br /> KA P.M.: WEATHER: Indoors, TEMP:70'F <br /> tr r <br /> i � <br /> ;r <br /> As requested by Hughes Construction; <br /> Inspected the full aspects of Cold Formed Steel Stud Framing,Shear Walls,Floor Joists,Holdowns,Anchor Bolts&Fasteners <br /> in support of Equipment Mezzanine and the attachment of YV Plywood Floor Sheathing for same. <br /> Found work and materials to be in conformance with the City of Everett approved project plans and specifications. <br /> Reviewed By: I 12 Ll/ ,— ASTM Test#: F - Asset Numbe s <br /> To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519•Poulsbo(360)598-2126•Tacoma(253)939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client This report may not be reproduced in any format without the written permission of the client and Krann&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by others on site.The test results apply only to the specific locations,and items inspected or tested.Template date 11/12/2023 <br />