Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />6/12/2024 <br />6/12/2024 <br />BLDG 14-ROOF <br />RAKEEB KHAN <br />APPROVAL <br />eTRAKiT Inspection Request <br />NAILING <br />Notes: <br />6/8/2024 9:32 AM Bernard Fajarillo <br />ROOF SHEAR NAILING <br />Contact Name: Walter Limon <br />Site Address: 1202 E CASINO RD <br />Phone:4252246701 <br />e-Mail: walter.limon@gmail.com <br />6/12/2024 <br />6/12/2024 <br />BLDG 11-INTERIOR <br />RAKEEB KHAN <br />CORRECTION <br />SHEAR <br />REQUIRED <br />Notes: <br />Existing wall at addition not ready. Follow detail 7/s6.1. Interior shear at bedroom E is missing shear connection to truss and truss does not have <br />sheathing per detail 8/s6.1. <br />9/12/2024 <br />9/12/2024 <br />BLDG 11-INTERIOR <br />I RAKEEB KHAN <br />CORRECTION <br />eTRAKiT Inspection Request <br />SHEAR <br />REQUIRED <br />Notes: <br />9/9/2024 11:05 AM Bernard Fajarillo <br />Follow-up Correction Inspection <br />Contact Name: Walter Limon <br />Site Address: 1202 E CASINO RD <br />Phone:4252246701 <br />e-Mail: walter.limon@gmail.com <br />Not ready. Need updated engineer detail at new wall. Shear at existing wall not ready. <br />9/20/2024 <br />9/20/2024 <br />BLDG 02- <br />Matt Schreifels <br />COVERED W/O <br />deck footings (see notes) <br />FOOTING/SETBACK <br />APPROVAL <br />Notes: <br />Deck footing pads concrete was placed without inspection. Location and number of pads do not match approved engineering drawings. Remove <br />improperly, placed concrete pads and schedule for footing setback inspection prior to placing concrete for new pier pads. <br />9/20/2024 <br />9/20/2024 <br />BLDG 08-FRAMING <br />Matt Schreifels <br />CORRECTION <br />deck framing (See notes) <br />REQUIRED <br />Notes: <br />9/19/2024 10:34 AM Bernard Fajarillo <br />Partial frame inspection for Deck <br />Contact Name: Walter Limon <br />Site Address: 1202 E CASINO RD <br />Phone:4242246701 <br />e-Mail: walter.limon@gmail.com <br />Deck framing, does not match approved structural plans for direction or ledger, connections, deck, concrete pier pads were poured and placed without <br />inspections provide updated engineering for layout as installed or revise install framing to match approve plans prior to pouring new concrete pier <br />pads, schedule inspection for footing setback <br />I <br />Printed: Tuesday, 15 April, 2025 4 of 8 rk <br />SUPERION <br />